Laserfiche WebLink
-2- <br /> • Fire Department <br /> >Main number will become non-published and all calls answered <br /> by main attendant at 3301 Silver Lake Road address during <br /> business hours - with calls going directly to the Fire De- <br /> partment after hours. <br /> Public Works Department <br /> >Add a second line. <br /> >Have calls answered the same as the Fire Department. <br /> Water Plant <br /> >Reduce from flat rate line to a measured line (rates based <br /> on number of minutes of usage per month) . <br /> Emerald Park <br /> >Reduce from flat rate line to a measured line. <br /> Silver Point Park <br /> >Remains the same. <br /> • FINANCIAL ANALYSIS <br /> Norstan AT&T U. S. West <br /> Equipment per month $ 306. 10 $ 304.66 $ 797.61 <br /> (based on 5 year <br /> lease/purchase) * <br /> Installation (one time 2 ,667.60 204.00** 1, 373 .50 <br /> charge) <br /> Cost to NWB 450.32 572.41 447.52 <br /> (U.S. West) <br /> Parks (Silver Point, $ 105.07 $ 105.07 $ 105.07 <br /> Emerald, Central) <br /> Total Cost (per month) $ 861. 39 $ 982.14 $1,350.20 <br /> * This will be the cost for equipment per month under a 5 year <br /> lease/purchase plan. After 5 years, this cost would drop off. <br /> ** AT&T's installation cost is lower because they can use exist- <br /> ing equipment. <br /> • <br />