Laserfiche WebLink
DEC-19-2000 15:28 WSB & ASSOCIATES INC. 7635411700 P.02i02 <br /> -100 <br /> Ms. Sue Henry <br /> • Assistant City Manager <br /> St. Anthony, MN <br /> December 19, 2000 <br /> Page 2 <br /> • The developer will require a permit from the MPCA to deal with the contaminants <br /> onsite. All conditions of that permit, including recommendations for lining of the <br /> pond shall be adhered to. The developer shall forward a copy of this permit to the <br /> City prior to approval of final plans. <br /> • The currently-proposed outlet structure generally meets the criteria outlined in our <br /> December 7,2000 letter. However,we will work with the developer in fine-tuning <br /> the outlet structure in the final design. <br /> • The current contours indicate that the lot has been graded such that the drainage from <br /> the parking lot area is directed toward the front entrance of the Walgreen's pharmacy <br /> and the parking spaces immediately adjacent to the building on the east side. It is <br /> recommended that in final design,minor contour changes be made to the plans such <br /> that overland drainage would be allowed to flow past the building along the south <br /> side or along the north side so as to prevent drainage from inundating the structure <br /> during intense rainfall events. .An overland, overflow route around the building <br /> should be adequately provided to address this concern. <br /> • We are currently researching the City's rights to the 36" RCP storm sewer to the <br /> north of the property. We anticipate that the developer may require a permit from the <br /> railroad to connect with this line. This issue shall be resolved prior to final design <br /> approval. <br /> All of the concerns outlined above can be addressed in final design. If you have any <br /> questions regarding this matter,please call me at(763)287-7182. <br /> Sincerely, <br /> WSB &Associates,Inc. <br /> Todd E. Hubmer,P.E. <br /> Project Manager <br /> c: Jay Hartman, City of St. Anthony <br /> Mike Mornson, City of St. Anthony <br /> • Mike Kalscheur,Told Development <br /> nm <br /> F:\W P W LM i o 6S-52U 21900 wpd <br /> TOTAL P.02 <br />