Laserfiche WebLink
♦ Observation regarding conversion to Teen Center: <br /> • Some movement of CMU in exterior walls is plainly visible near Southeast stair, <br /> cracks are in the CMU and the concrete beam <br /> • At Southeast comer of the building daylight can be seen penetrating through <br /> cracks in the exterior walls <br /> D. Exterior Envelope: <br /> ♦ Description: <br /> Walls: <br /> • Concrete Masonry Units <br /> (CMU);painted <br /> • Brick veneer with CMU back <br /> up wall on the front fagade <br /> • A 2 feet wide,green color <br /> horizontal painted band is <br /> along the top of the building <br /> which discontinuous at the <br /> east wall <br /> Roof: <br /> • EPDM roof membrane with <br /> 1'/z"rock ballast <br /> • Roof is drained through downspouts on the East and West Side only—No <br /> downspouts on front and rear walls-No internal drains <br /> • Previous owner had the re-roofing done in 1991.Current owner have <br /> installed a new 3' wide membrane patched around the perimeter with the <br /> new wood blocking and metal flashing in year 2000 <br /> Height: <br /> • Building height on the exterior varies anywhere from 20' to 22 feet with <br /> slope along the building <br /> Windows: <br /> • This building has two fixed <br /> windows on the front <br /> fagade.These are the only <br /> windows in the entire <br /> building exterior,approx. <br /> size 8'x5' with insulated <br /> glass <br /> • A window size opening <br /> which opens towards the <br /> front of the building from <br /> the office is covered with <br /> glass block <br /> Doors: <br /> • Aluminum storefront entrance system including one double door <br /> • A hollow metal double door near Southeast corner of the building which <br /> opens from mid landings of the rear stairs <br /> • One 8' wide overhead sectional door at the lower level <br /> 6 <br />