My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 07212001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 07212001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:38:58 PM
Creation date
12/30/2015 7:38:34 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 07212001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. ELECTRICAL DESCRIPTION <br /> The following information summarizes electrical existing conditions and observations during a site <br /> walk through on Tuesday, December 12, 2000. Please note that not all areas of the building were <br /> observed. .Jim Monk, the building engineer for Apache Plaza, provided the tour and answered <br /> questions. The areas of the mall are listed in the order in which they were observed. <br /> Basement Level— Old Bowling Alley <br /> Lighting- <br /> 2x4, recessed, fluorescent troffer fixtures with (2) 4' lamps above bowling areas <br /> 4', surface, fluorescent strip fixtures with 4' lamps on soffits above lanes <br /> 4', surface, fluorescent wraparound fixtures with (2) 4' lamps in circulation area <br /> incandescent recessed can fixtures in circulation area <br /> ■ "bug-eye" fixtures for emergency lighting <br /> exit lighting along egress pathways <br /> Power- <br /> (1) 400A, 208/120V GE panelboard <br /> (1) 400A, 240/120V GE panelboard <br /> (1) 225A, 208/120V GE panelboard <br /> (2) 100A, 208/120V GE panelboards <br /> Basement Level—M&E Equipment Rooms (East of old Bowling Alley) <br /> Power- <br /> Utility transformer vault along east-side of building <br /> ■ (1) 2000A, 480/277V GE switchboard in area main electrical room <br /> (1) 1200A, 208/120V GE switchboard in area main electrical room <br /> (1) 1000A, 208/120V GE switchboard in air handling unit/chiller room <br /> (1) 400A, 240/120V GE panelboard in boiler room <br /> Systems- <br /> . (1) telephone distribution patch panel in north-south corridor into chiller room <br /> ■ Basement Level— Herberger's <br /> Power- <br /> Utility transformer vault at northwest corner of building <br /> (1) 1000A, 208/120V GE switchboard in area main electrical room <br /> Systems- <br /> ■ (1) main telephone distribution patch panel in chiller room <br /> Basement Level— Below Anderson Furniture <br /> Power- <br /> Utility transformer vault at southwest corner of building <br /> (1) 3000A, 208/120V GE switchboard in area main electrical room <br /> Numerous power drop cords in old manufacturing production area <br /> Systems- <br /> (1) telephone distribution patch panel in old manufacturing production area <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.