Laserfiche WebLink
8. 3 underground electrical disconnects. <br /> 9. 1 underground phone line disconnect. <br /> 10. Approximately 19.5 acres of bituminous pavement. <br /> 11. Approximately 1.0 acre of concrete sidewalk. ❑ <br /> Possibilities ❑ <br /> 1. 1-2 sanitary sewer plug(s). ❑ <br /> 2. 1-2 storm sewer plug(s). <br /> 3. Install 510 LF of water main. <br /> 4. Install 285 LF of storm sewer and 2 manhole structures. <br /> 5. Install 390 LF of sanitary sewer and 1 manhole structure. ❑ <br /> Further review would be necessary with the City to determine which utility services must be ❑ <br /> maintained during site preparation or development activities. ❑ <br /> D <br /> O <br /> ❑ ' <br /> a <br /> D <br /> ❑ <br /> 0 <br /> .18 ❑ <br />