Laserfiche WebLink
4.2_ 33'd Avenue N.E. <br /> Proposed improvements for 33'd Avenue include a number of different <br /> ' repair methods for the concrete pavement, all of which are identified as <br /> Mn/DOT 1999 Concrete Pavement Rehabilitation Standards. The <br /> ' rehabilitation standards depict various joint, crack, surface, edge repair <br /> and replacement.These are the standards used during the report phase and <br /> will also use for the plan preparation phase. Estimation of different repair <br /> methods, reinforcement replacement, crack repair and joint sealing is an <br /> estimating process by the engineer based upon his perception looking at <br /> the top of the various concrete panels. During construction, it is possible <br /> that the designated repair for a particular panel or area could become <br /> more or less or a different type of repair would be required than originally <br /> estimated. It is therefore important during the construction phase for full- <br /> ' time inspection and willingness to be flexible once the repairs get <br /> underway. <br /> After all necessary repairs or replacements have been made and new <br /> concrete panels placed have properly cured,diamond grinding or concrete <br /> planing will be performed to smooth out rough spots and differential <br /> settlement locations to significantly improve ridability. <br /> Areas where curb and gutter is deteriorated will be replaced and new <br /> catch basins and manholes placed into new concrete panels. <br /> 5.0 Construction <br /> Residents living adjacent to the project will be inconvenienced by <br /> construction of the proposed improvements. Through good <br /> communication and coordination, this inconvenience will be minimized. <br /> Traffic control and detour plans will be developed to guide traffic through <br /> and around the construction zone. <br /> A neighborhood informational meeting was held at City Hall on October <br /> 28, 1999 to discuss the project,describe the traffic control and answer any <br /> questions that the affected residences had. <br /> The construction will be phased to keep half the street open at all times. <br /> Local access will be maintained at all times, although individual driveway <br /> entrances may be blocked from time to time. Residents will be notified in <br /> advance of all driveway closures. <br /> Currently Metro Transit Route Number 1 has a total of 24 daily trips <br /> ' between Stinson Boulevard and Silver Lake Road along 33'd Avenue NE. <br /> The split is equal with a total of 12 buses going in each direction. Dick <br /> 33rd Avenue Improvements Silver Lake Road to Stinson Boulevard A-SANTH9902.00 <br /> St. Anthony, Minnesota Page 6 <br />