My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02141989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 02141989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:35:01 PM
Creation date
12/30/2015 4:34:48 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 02141989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-7- <br /> 4) To provide expertise in city-related construction aspects <br /> projects and proceedings during any and all on-site <br /> construction . <br /> 5) To satisfy all Federal , State and local requirements <br /> including construction or building permits and approvals; <br /> verify compliance with all environmental requirements; obtain <br /> access rights-of-way and easements necessary to complete .the <br /> subcontract; provide access for EPA, State, their <br /> representatives, and contractors at all reasonable times; <br /> assist in resolving design problems associated with <br /> interpretation of contract plans and specifications. <br /> 6) To schedule and administer progress and specifically <br /> called meetings, including agenda preparation; meeting <br /> arrangements, recording and distribution of minutes; The City <br /> shall determine payment quantities. <br /> 7) To maintain site-specific accounts and documentation for <br /> reimbursement and to help assure successful recovery of <br /> CERCLA and State funds , including: <br /> - Employee hours and salary (time sheets) <br /> - Employee travel and per diem expenses (travel <br /> authorizations, paid vouchers, treasury schedules) <br /> - Receipts for materials, equipment and supplies. <br /> - Contract cost (paid invoices, treasury schedules and copy <br /> of the contract) <br /> - Any other costs not included above. <br /> The City shall retain documentation for six years from <br /> completion of the Extended RA or until any litigation <br /> dispute, claim or audit is completed and resolved, whichever <br /> is longer. <br /> 8) To utilize an extended RA Operation and Maintenance Plan <br /> prepared by the State in accordance with plans and <br /> specifications and with applicable guidance documents during <br /> design. The City shall use the plan during shakedown (the <br /> first year after completion and acceptance.) , the additional <br /> up to nine years of extended RA, and the remaining life of <br /> the project. <br /> 9) To submit detailed monthly progress reports to the State. <br /> The contents of the report shall reflect a chronologized <br /> record of all site activities and shall include: <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.