Laserfiche WebLink
• Exterior Loading/Storage Areas and Garden Shops <br /> When it is necessary to locate loading docks , storage <br /> and trash staging areas outside the wa is o the p in- <br /> ciple structure , those activities s")be positioned <br /> ana�Jl1� J� <br /> adjacent toS tttladt p nciaple ss,trruct re T�hoe e exterior <br /> �functionss Jbe otllyscree mvs <br /> ew by a <br /> permanent wall constructed of the same material as the <br /> principle structure and the wall's shall be designed in <br /> such a way as to appear to be an integral portion of <br /> the building . ' <br /> • Roof Drainage -6 Uy) ��eY4 f eA1 Abt Fe55Ab <br /> All roof ( and site ) drainage 94e4, . be connected to the <br /> municipal storm sewer system. a,.'; ^^n <br /> b_ d j:f% h 8-1-1- ^ <br /> e2 __ ____ �..�. <br /> 21 <br />