My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 03202001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 03202001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:40:18 PM
Creation date
12/30/2015 7:40:11 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 03202001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting Minutes <br /> January 29, 2001 <br /> Page 3 <br /> 1 Jensen stated he.does not think the concession stand will be opened a lot, unless there is a <br /> 2 weekend tournament event. He commented that running a concession stand takes a lot of <br /> 3 planning. <br /> 4 Zurbey stated he thinks the key issue is the bathrooms and how that can be incorporated into the <br /> 5 football area so satellites are not needed. <br /> 6 Jensen stated he sees potential for high school booster groups to use the concession stand in the <br /> 7 spring. Then it would make sense to have a parent booster group to organize the concession <br /> 8 stand. <br /> 9 Skrivseth arrived at 6:10 p.m. <br /> 10 Molly Olivier, architect from Short, Elliot, Hendrikson(SEH), was available via a speaker <br /> 11 telephone connection. <br /> 12 Jindra stated the consensus of the Commission is to proceed with a combined shelter with the <br /> 13 concession stand connected to the building and facing south. She stated questions have been <br /> 4 raised about the price and having more picnic,tables.. <br /> 15 Ms. Olivier explained that she has to lay out the tables to provide ADA access around the tables. <br /> 16 Jindra suggested that an area be extended to allow additional space for tables. <br /> 17 Mr. Kost stated the building is 130 feet long with the patio space. He noted the wading and play <br /> 18 areas are to the north so it may be a good idea to have the additional seating area in that location. <br /> 19 Jindra stated they talked about making a more formal entrance to the park. Mr. Kost stated they <br /> 20 did talk about that as well as the need for ADA access and possibly the location of some stairs. <br /> 21 Jindra asked for a price estimate. Ms. Olivier stated the main body of the building is 2,241 <br /> 22 square feet at $150 per foot,the pavilion is 1,131.5 square feet at $75 per square foot, the <br /> 23 concrete pad would be $15 per square foot, and the area underneath the roof is at$50 per square <br /> 24 foot. Ms: Olivier stated this would total $499,367.50 plus a 10% contingency fee: She reviewed <br /> 25 the types of building materials that would be included. <br /> 26 Jindra asked about installing conduit at this time for possible future use. Ms. Olivier stated she <br /> 27 did include the placement of J-box and conduit so it could be wired in the future. <br /> 28 Jindra reviewed the costs for the Fridley park shelter which included demolition. Ms. Olivier <br /> f 329 stated she did not explore the cost of demolition and suggested they first determine under which <br /> 0 contract that could occur. <br />
The URL can be used to link to this page
Your browser does not support the video tag.