My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02202001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 02202001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:40:09 PM
Creation date
12/30/2015 7:40:03 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 02202001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting Minutes <br /> January 29, 2001 <br /> Page 5 <br /> Mr. Hartman stated the building size will probably not exceed this threshold. The Commission <br /> agreed. Mr. Kost stated their design will just identify the pad and they will bring the sewer and <br /> water within five feet of the building so the building contractor cari make the connection. Mr. <br /> Kost stated he will prepare a site plan which Mr. Hartman can provide to the Commission. <br /> Anderson suggested the subcommittee meet again'to address.the types of groups that will use this <br /> facility, peak attendance,need for picnic tables, etc. He stated he thinks this concept may include <br /> more covered space than is needed. Once those issues are identified, Ms. Olivier will be better <br /> able to determine the size of building which meets that need.. <br /> Skrivseth reviewed the current size of programs and estimated an attendance of at least 40 <br /> children. <br /> Zurbey stated he thinks the size of the concession stand and bathrooms (with double vanities) is <br /> too large. <br /> Jindra stated she thinks there is plenty of picnic space available. Skrivseth stated the picnic areas <br /> are rented out every summer weekend. <br /> The Commission agreed that the shelter.will not exceed 2,240 square.feet. <br /> Landscape Subcommittee <br /> Jindra stated the Landscape Subcommittee has not yet met. <br /> Field Subcommittee <br /> Zurbey stated this information gives them a lot if issues to raise with the athletic director. <br /> Jensen stated he has contacted a Senior Parks Designer for the City of St. Paul who deals with <br /> landscaping and trails and is willing to meet with the subcommittee and provide input. <br /> It was decided the Field Subcommittee would meet with this Senior Parks Designer on <br /> Wednesday, January 31,2001, and to also invite Ted Severson. . . <br /> Mr. Kost stated the plans can be finalized on February 12th. If approved by the Commission, <br /> then it will take them several weeks to complete the plans. Once the plans are.approved,they <br /> will go out for bids. He reviewed the other issues that they can get prices for in case the <br /> Commission wants to consider it for future planning. <br /> meeting with City Staff and BRW and indication that BRW would <br /> Anderson reviewed his m ty <br /> g <br /> include as many bidding options as possible to allow the Commission to make those decision <br /> once the bids are known. He stated they did drop the bid option for placing drain tile under the <br /> fields. <br />
The URL can be used to link to this page
Your browser does not support the video tag.