Laserfiche WebLink
4. <br /> • Barr <br /> Engineering Company <br /> 8300 Norman Center Drive <br /> Minneapolis,MN 55437-1026 <br /> Phone: (612)832-2600 <br /> Fax: (612)835.0186 <br /> January 17, 1992 <br /> Mr. Larry Hamer <br /> Director Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dear Mr. Hamer: <br /> This letter summarizes the actions taken on January 2, 1991 to demolish the <br /> old water chute and surrounding works in preparation for the new outlet <br /> construction. We originally had intended to demolish 2-6' sections of the <br /> existing RCPA and tieing in there to the existing pipe with the new outlet works. <br /> When the demolition of the two designated sections was complete, the remaining <br /> pipe could be observed as severely undermined and not suitable as a tie-in for <br /> the new work. Two more sections were removed until a solid pipe was observed. <br /> There still existed a void under the center of the pipe, but both sides of the <br /> pipe were well supported. <br /> The bulk of the cost for this new pipe to replace the additional two <br /> sections removed will be paid by the bid item '60" RCP' . The additional quantity <br /> is 12 feet and the contract price is $120 resulting in a price of $1,440. The <br /> Contractor may request additional money for demolition of the two pipe sections <br /> removed and for gravel used to fill the voids. More grounds were disturbed while <br /> doing the extra work. That will add some restoration costs. <br /> It is probable that the total additional costs resulting from this work will <br /> remain well under $2,000. <br /> Sincerely, <br /> e44­.A __1 �(_� . <br /> Dana R. Gauthi r <br /> DRG/kmh <br /> 23\27\522\LH15.LTR <br /> • <br />