My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
StAnthony
>
City Council
>
City Council Resolutions
>
1980
>
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:12:31 PM
Creation date
12/30/2015 7:12:29 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1980
SP Name
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the same drainage area in both Roseville and St. Anthony <br /> • (hereinafter referred to as the "Feasibility Study") . <br /> 5.. It is the desire of Roseville and St. Anthony to <br /> obtain the Feasibility Study jointly, with St. Anthony coordi- <br /> nating the study and the cost thereof being shared equally by <br /> the two Cities. <br /> . 6. This agreement .sets forth the agreement between <br /> Roseville and St. Anthony for the Feasibility Study pursuant <br /> to the Joint Power Act, Minn. Stat. § 471.59. <br /> NOW, THEREFORE, in consideration of the mutual covenants <br /> herein contained, it is agreed by and between Roseville and <br /> St. Anthony, as follows : <br /> 1. Engineering work for the Feasibility Study shall be <br /> • done by a''mutually agreed upon consulting engineering firm. <br /> 2 . After agreement as to. -the engineering firm, St. Anthony <br /> shall forthwith cause the Feasibility Study to be conducted and <br /> an appropriate report to be prepared, and ,shall thereafter sub- <br /> mit the same to the City Councils for review as soon as possible. <br /> 3. Roseville and St. Anthony will supply all necessary <br /> information to the consulting .engineer for the completion of the <br /> Feasibility Study and will cooperate with the consulting <br /> engineer and each other to obtain the report as soon as possible. <br /> 4 . Each City' s decision to participate in the project <br /> shall be subject ,to any necessary public hearings and Council <br /> approvals. Neither City binds itself to proceed with a storm <br /> sewer project after the Feasibility Study -is completed. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.