My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11041998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 11041998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:53:03 PM
Creation date
4/19/2016 5:52:58 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1998
SP Name
CC PACKET 11041998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• As discussed, my approach most typically would use a `workshop' process for any of the <br /> `planning' meetings thus involving all appropriate representatives for St. Anthony <br /> Village in the decision making process. <br /> To complete the work as described, I propose the following fee structure: <br /> • Phase I: Needs Assessment Study and Budget Estimate <br /> $4,400.00 plus the cost of a budget estimate(s) from Constructive Ideas. <br /> • Phase II: Design through Construction <br /> Until further information is known, it is difficult to quote a fee for this Phase <br /> of the project. For planning purposes, the 1997 AIA Fee Guidelines suggest <br /> that the `average design' architect/engineering fees should range in the <br /> neighborhood of 6'/2-8 % of the cost of construction. <br /> My firm profile,personal resume,project sheets and references are attached for your <br /> information. Briefly, I have completed the following representative public work either <br /> through Luken Architecture or through previous employers (*): <br /> • Municipal Needs Assessment Study (includes Public Works), Lino Lakes, MN* <br /> • Phase I: PW Vehicle Holding Facilities, Monticello, MN* <br /> • Badger Field Well House Remodeling, Phase I: Design and Budget Estimate, <br /> Shorewood, MN <br /> . • Prototype Design and Fire Stations 17 & 22, Minneapolis, MN* <br /> • Fire Stations in Apple Valley and Lino Lakes, MN* <br /> • Master Plan*, Phase I: Tower* & II: Bum Building, MFD Fire Training Facilities, <br /> Minneapolis, MN <br /> • City Hall &Police Station, Zumbrota, MN <br /> • City Hall & Police Station, Burnsville, MN* <br /> • State Patrol Training Facilities, Camp Ripley, Little Falls, MN (current) <br /> • Ramsey County Government Center-East Renovation, St. Paul, MN* <br /> I hope that this proposal meets with your approval. If you have any questions, do not <br /> hesitate to call. Once again, thank you for your consideration. I look forward to working <br /> with you on the project. <br /> Sincerely, <br /> Ellen A. Luken,AIA <br /> Luken Architecture, P.A. <br /> 322 First Avenue North Suite 602 Minneapolis,Minnesota 55401 Phone(612)630-0074 Fax(612)630-0075 <br />
The URL can be used to link to this page
Your browser does not support the video tag.