My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HRA MINUTES 08131996
StAnthony
>
City Council
>
HRA Minutes
>
1996
>
HRA MINUTES 08131996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:40:20 AM
Creation date
7/26/2016 9:40:20 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Housing Redevelopment Authority
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
8/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Authority Meeting Minutes <br />• August 13, 1996 <br />Page 3 <br />1 Motion carried unanimously. <br />2 B. Change Order No. 10: Modifications to Hydronic Lines, <br />3 Mr. O'Brien explained this change order is to provide covering of the hydronic <br />4 lines in the classrooms. These covers were not included in the original bid. <br />Mayor Ranallo asked why they were not included. <br />6 Mr. O'Brien stated this was due to an oversight of the mechanical engineering <br />7 firm. He explained these lines supplement baseboard radiation in the classroom <br />8 and should be covered. <br />9 Motion by Wagner, second by Marks to approve Change Order No. 10, <br />10 Modifications to Hydronic Lines in an amount not to exceed $468.00. <br />11 Motion carried unanimously. <br />12 C. Change Order No. 11: Electrical Modifications for Council Chamber Equipment, <br />13 Ms. Hermann explained this change order included two items which were the <br />result of meeting with the Management Assistant and Consultant Pat Cook. One <br />portion of the change order was to move the open area in the floor of the Council <br />16 Chamber to allow more room between the podium and the counsel. The other <br />17 portion was to add a receptacle to the lobby to allow the capability to provide a <br />18 monitor in that area at a later date. <br />19 Enrooth stated he agreed with the receptacle in the lobby but questioned the first <br />20 portion of the change order as the final arrangement of the Council Chamber had <br />21 not yet been determined. <br />22 Momson asked if it was necessary to determine this modification immediately. <br />23 Ms. Hermann stated this had to be done now because it will affect how the floor is <br />24 poured. <br />25 Mayor Ranallo stated the City had not hired anyone to design the cable system for <br />26 the Council Chambers and questioned if this change would be premature. <br />27 Mr. O'Brien stated based on the walk through of the City Hall/Community Center <br />28 this evening and the possible changes to the Council Chambers, he felt this <br />29 change order was premature. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.