Laserfiche WebLink
Housing and Redevelopment Authority Meeting Minutes <br />November 26, 1996 <br />• <br />Page 2 <br />I VI. COMMUNITY CENTER/CITY HALL UPDATE. <br />2 <br />3 A. Discuss Change Order Relating to Council Chambers Floor. <br />4 B. Discuss Change Order Relating to Sealer for Floor. <br />5 C. Discuss Date for Building Dedication. <br />6 D. Other Building Items. <br />7 Jim O'Brien, Will Associates, Inc., distributed a photograph of a fountain. <br />8 The fountain is 80" high with a 10" x 20" x 6" deep pool. The fountain is available in 16 <br />9 ounce copper with a 3/8" diameter vertical frame for $3,500.00 and in 20 ounce copper <br />10 with V? diameter vertical frame for $4,050.00. These fountains are located in several <br />11 public places and have suffered no damage. Mr. O'Brien stated his opinion was that the <br />12 16 ounce copper version would serve the City of St. Anthony very well. <br />13 Wagner asked if a pool would have to be installed. Mr. O'Brien stated the fountain could <br />14 just be set on the floor with a form built around it. <br />15 <br />16 Wagner asked if anything else would be on this wall. Mr. O'Brien stated the fountain <br />17 would be the focus but something else could be placed on the wall to the side. <br />0 Morrison noted the;Council had decided to wait until they were moved into the building <br />19 to determine what would best fit on this wall. Mr. O'Brien noted this is a self-contained <br />20 pool which could be purchased and installed after completion of construction. <br />21 Marks stated he was concerned and would like to see what the entryway looks like upon <br />22 completion before making a decision. <br />23 Enrooth noted the fountain was versatile and could be placed in another area if it is not <br />24 appropriate for the entryway. <br />25 Motion by Marks, second by Faust to purchase the 80" high with 10" x 20" x 6" deep <br />26 pool fountain, fabricated of 16 ounce copper with 3/8" diameter vertical frame in the <br />27 amount of $3,500.00. <br />28 Motion carried unanimously. <br />29 Mr. O'Brien explained a new manhole was necessary in the storm line northeast of the <br />30 building. Mr. O'Brien stated based on earlier conversation with Larry Hamer, he had <br />31 been under the impression that the City would be providing the manhole. It has been <br />32 determined the cover and casting will be provided by the City and installation will be <br />6 provided by the contractor. <br />