My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM NO. DESCRIPTION UNITS ESTIMATED <br />QUANTITY <br />UNIT PRICE <br />BID <br />ESTIMATED <br />TOTAL <br />2104.501 REMOVE SEWER PIPE (STORM)L F 2165 $8.00 $17,320.00 <br />2104.509 REMOVE PIPE APRON EACH 1 $500.00 $500.00 <br />2104.509 REMOVE DRAINAGE STRUCTURE EACH 16 $400.00 $6,400.00 <br />2451.602 AGGREGATE BEDDING (LV)C Y 200 $40.00 $8,000.00 <br />2503.541 36" FLARED END SECTION WITH TRASH GUARD EACH 1 $2,800.00 $2,800.00 <br />2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V L F 1220 $38.00 $46,360.00 <br />2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS III L F 600 $40.00 $24,000.00 <br />2503.541 36" RC PIPE SEWER DESIGN 3006 CLASS III L F 870 $58.00 $50,460.00 <br />2503.602 CONNECT TO EXISTING STORM SEWER EACH 3 $1,500.00 $4,500.00 <br />2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 1 $1,500.00 $1,500.00 <br />2503.602 CONSTRUCT BULKHEAD EACH 1 $500.00 $500.00 <br />2503.602 RANDOM RIP RAP CLASS IV FIELD STONE C Y 20 $140.00 $2,800.00 <br />2503.602 GEOTEXTILE FILTER FABRIC TYPE IV SY 30 $3.00 $90.00 <br />2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48‐4020 L F 56 $300.00 $16,800.00 <br />2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60‐4020 L F 56 $400.00 $22,400.00 <br />2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 10 $1,800.00 $18,000.00 <br />2506.602 CASTING ASSEMBLY (STORM)EACH 20 $550.00 $11,000.00 <br />$233,430.00 <br />+10% CONTINGENCY $23,350.00 <br />SUBTOTAL CONSTRUCTION COST SCHEDULE D. ‐ STORM SEWER IMPROVEMENTS $256,780.00 <br />+25% INDIRECT COSTS $64,200.00 <br />GRAND TOTAL CONSTRUCTION COST SCHEDULE D. ‐ STORM SEWER IMPROVEMENTS $320,980.00 <br />TOTAL CONSTRUCTION COST SCHEDULE D. ‐ STORM SEWER IMPROVEMENTS <br />SCHEDULE D. ‐ STORM SEWER IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 010507‐000 <br />ST ANTHONY, MN <br />JULY 28, 2017 <br />54
The URL can be used to link to this page
Your browser does not support the video tag.