My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08282017
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2017
>
PL PACKET 08282017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 8:06:25 AM
Creation date
8/29/2017 7:56:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Village LLC Traffic Study –Supplemental Traffic Review <br />August 15, 2017 <br />Page 2 <br />Table 1 <br /> below shows the existing traffic volumes, based on the counts completed in October <br />of 2016. <br />Table 1 – Traffic Volume Summary <br />Existing 20162030 No-Build2030Build <br />2040 <br />Location <br />AM PM AM PM AM PM <br />ADT <br />ADTADTADT <br />PeakPeakPeakPeakPeakPeak <br />Stinson Pkwy- <br />South of Lowry 8,0006981,0538,2007161,07810,2508861,29311,500 <br />Ave /Kenzie Tr <br />Lowry Ave - <br />West of Stinson 7,0007931,1177,1508121,1427,5008331,1688,100 <br />Pkwy <br />2.How many vehicles wouldthere be at full build (2030) of the site on: Stinson Parkway <br />south of LowryAvenue/Kenzie Terraceand Lowry Avenue west of Stinson Parkway <br />(ADT and peak hour)? <br />The 2030 no-build condition was determined by projecting the existing traffic volumes with <br />abackground growth factor of 0.15% per year based on the Metropolitan Travel Demand <br />model projections. <br />The 2030 full build traffic volumes were then determined by adding the proposed site traffic <br />to the 2030 no-build volumes. The estimated trip generation from the proposed <br />redevelopment project was based on rates for other similar land uses as documented in the <br />Table 1 <br />Institute of Transportation Engineers Trip Generation Manual, 9th Edition. above <br />shows the 2030 no-build and 2030 build traffic volumes. <br />3.How many vehicles would there be by 2040 on: Stinson Parkway south of Lowry <br />Avenue/Kenzie Terraceand Lowry Avenue west of Stinson Parkway (ADT and peak <br />hour)? <br />The original Traffic Study did not evaluate the year 2040 conditions. However, the City’s <br />Comprehensive plan update currently being prepared did provide projections to 2040. The <br />plan has not been approved by the City or Met Council so they are still considered draft <br />Table 1 <br />projections. Peak hour volumes have not been determined or analyzed. shows the <br />2040 ADT traffic volumes from the draft modeling which has been completed. <br />4.Can thecurrent roadway designs handle the additional traffic? Will it worsen <br />congestion duringpeak hour? <br />With any increase in traffic volume congestion would worsen, howeveran analysisneeds to <br />be completed to determine what impact it would have on the area intersections and roadway <br />segments. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.