Laserfiche WebLink
2017 Annual Report  • Public Works Department  •  St. Anthony Village, Minnesota    <br /> <br />  <br />  <br />5  <br />  <br />  <br />During 2017 the Water/Sewer  Division completed the following  <br />projects:  <br /> Updating of utility record drawings and mapping into  <br />the City GIS Program.  <br /> Jetted the sanitary sewer main lines and inspected storm  <br />sewer structures.  <br /> Annual hydrant inspection, flushing and repair.  <br /> Inspection and maintenance of the city’s water  <br />distribution system and well pumps.  <br /> Maintenance and repair of sanitary sewer lift station sites.  <br /> 2016 CCR Report.  <br />VEHICLE MAINTENANCE DIVISION <br />The Vehicle  Maintenance Division (Fleet Maintenance) provides the necessary vehicle  <br />maintenance and repairs all the City’s Public Works vehicles and equipment, which includes  <br />both licensed and non-licensed equipment. In addition, the division supports the Police and Fire  <br />Department with their maintenance needs. The City’s existing Vehicle  Maintenance Division  <br />staff is trained and licensed to certify all vehicles in the fleet to meet DOT standards and pass  <br />inspections on an annual basis.  <br />The Maintenance Division assists in the purchase and specification process when replacing  <br />capital equipment for the Public Works Department. It has always been the goal of this division  <br />to provide the necessary service and repair of all City owned equipment in a manner which is  <br />competitive with outside service alternatives.  <br />The Public Works capital equipment purchases included as  <br />follows:  <br /> 2017 Parks  Maintenance Division F-250 Pickup  <br />Truck  <br /> 2017 Streets Maintenance Division F-350 Pickup  <br />Truck with Lift Gate and Arrow Board   <br /> 2017 Street Maintenance Division Bobcat Skidsteer  <br />Replacement Program