My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 04142003
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2003
>
PK PACKET 04142003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2019 3:18:30 PM
Creation date
8/6/2019 3:18:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting Minutes <br />March 10, 2003 <br />Page 6 <br />1 for Commission review before making that determination. Council Liaison Sparks suggested <br />2 meeting to review the location on Thursday, March 13, 2003. <br />3 <br />4 Commissioner Ganley stated that the lower field turf is practically non-existent due to bad soil <br />5 and constant flooding in the area. He asked how long they would need to wait for the hydro- <br />6 seed to take before they could use the fields to play. Mr. Hubmer explained that hydro seeding <br />7 was done last spring adding that they returned in the fall to re -seed. He stated that they are <br />8 hoping that it would take off well by this spring. He stated that they would like to bring in some <br />9 topsoil for the grass. <br />10 <br />11 Commissioner Ganley clarified that the Commission was told the grass would have to be cut at <br />12 least three times before the area could be used. Mr. Hubmer stated that would be the ideal, as it <br />13 would allow the grass to get a good hold. Chair Jindra asked, with ideal conditions, when could <br />14 they hydro -seed. Mr. Hubmer stated that with ideal weather conditions they could probably <br />15 begin around the first week of May. He stated that it could be awhile noting that the frost went <br />16 pretty deep this year. <br />17 <br />18 Mr. Zurbey asked if they would be able to seed earlier if they brought in the topsoil. Mr. <br />19 Hubmer stated that the key issue is getting the equipment onto the soil. He stated that as soon as <br />20 the ground is dry enough to get the equipment out they could begin to seed. <br />2. Chair Jindra asked if they are looking for a decision from the Commission. Mr. Hubmer stated <br />23 that they would like a decision. He explained that timing is an issue stating that they would like <br />24 a decision so they could place the order for the building and bring the contractor onboard. <br />25 <br />26 Chair Jindra asked if they would be able to stake the area this week and show how it would <br />27 actually impact the field. She clarified that the other location is no longer an option. Mr. <br />28 Hubmer explained that the other location is not an option. He stated that it would involve a <br />29 complete redesign that would add expenses and impact the ballfields. <br />30 <br />31 Mr. Zurbey referenced the doors and asked if they would be able to open a door on the side <br />32 where the windows are located. He explained that this would provide easier access for the <br />33 children and eliminate the need for them to walk around the building. <br />34 <br />35 Commissioner Gebhardt asked how much it would cost to install a basketball court and where <br />36 would they put the court. Mr. Hubmer stated that it would not be very expensive noting that it <br />37 would probably cost an additional $1000. He stated that they would review how everything <br />38 would fit and provide the Commission with an update on their findings. <br />39 <br />40 Commissioner Ganley stated that if they seed in the spring would they be willing to return in the <br />41 fall for possible repairs. Mr. Hubmer stated that they would be willing to do spot repairs. <br />42 <br />z Chair Jindra asked if they could plan for completion by late summer. Mr. Hubmer stated that he <br />44 is concerned about the potential wet conditions. He stated that there is a chance they could be <br />45 completed by late summer adding that he did not want to commit at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.