Laserfiche WebLink
Parks Commission Meeting Minutes <br />December 11, 2000 <br />Page 3 <br />1 Mr. Hartman asked if the Commission was in favor of renovating the existing shelter or <br />2 recreating a shelter. Jindra noted the Commission is looking to renovate the existing shelter and <br />3 add a picnic pavilion near the shelter as a free standing structure. She asked that the Commission <br />4 be provided with a separate and/or attached picnic area. <br />5 Mr. Hartman asked if the picnic area was a needed component. Jindra indicated she felt this was <br />6 a necessary component and indicated she felt the free standing pavilion could be attractive for <br />7 neighboring residents. <br />8 Mr. Druger asked if a rubber flooring would be acceptable within the warming house. Mr. <br />9 Hartman indicated this would be a major expense up front, and noted other warming houses <br />10 place particle board over the flooring to prevent damage to the surface underneath. <br />11 Jindra indicated she would like to see a gas fireplace within the meeting room area to keep the <br />12 room inviting. <br />13 Jensen asked if the pavilion and concession stand would contain the same design elements. He <br />14 indicated he would like to see continuity between the structures. Mr. Druger stated he would <br />15 suggest the same color schemes and design elements. <br />16 Jindra asked that Mr. Druger have design sketches for the shelter and concession stand before the <br />17 Commission at their January 8" meeting. Mr. Druger indicated he would provide this <br />18 information back to the Commission as requested. He requested the names and numbers of those <br />19 who would be interested in making preliminary comments before the January 811 meeting for <br />20 suggestions. <br />21 V. DISCUS SILVER POINT PARK SHELTER AND FUNDING AVAILABLE FOR <br />22 SHELTER REPLACEMENT. <br />23 Mr. Hartman indicated the funding issues were addressed at the last meeting by Todd Hubmer <br />24 and indicated he was present to address these issues with the Commission in more detail. <br />25 Todd Hubmer indicated funds were available were from the Minnesota Department of Natural <br />26 Resources at this time. He suggested the Commissioners not get set on the amount of funding at <br />27 this time but instead chose a style of pavilion and seek out the funding after a design has been <br />28 created. Mr. Hubmer noted the DNR could be addressed again for additional funding to meet the <br />29 needs of a functional structure. <br />30 Jindra asked if this structure could be completed by next spring. Mr. Hubmer noted this would <br />31 be more realistically be completed in late summer. <br />'2 Zurbey asked where the shelter would be located within this park. Mr. Hubmer noted the <br />:s3 placement at this time would be adjacent to the playground structures. He indicated the area has <br />34 been marked off. <br />