My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08112020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 08112020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2020 3:53:42 PM
Creation date
8/6/2020 3:33:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report <br />2021 Street and Utility Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 015900-000 PAGE 3 <br />2. INTRODUCTION <br /> <br />2.1 AUTHORIZATION <br /> <br />On May 12, 2020, the St. Anthony Village City Council authorized the preparation of an engineering <br />Feasibility Report for the 2021 Street and Utility Improvement Project. This project was authorized under <br />City of St. Anthony Village Resolution 20-047. <br />2.2 SCOPE <br />Improvements outlined within this report include reconstructing the following roadways: <br /> <br />• Skycroft Drive from 32nd Avenue to 33rd Avenue <br />• Croft Drive from 32nd Avenue to 33rd Avenue <br /> <br />Proposed improvements include road reconstruction complete with bituminous paving, concrete curb and <br />gutter, watermain and sanitary sewer replacement, and the extension of new storm sewer and catch <br />basins to improve area drainage. <br /> <br />The feasibility study also includes the review and cost analysis to mill and overlay the following roadways: <br /> <br />• 31st Avenue from Rankin Road to Old Highway 8 <br />• Croft Drive from Rankin Road to 31st Avenue <br />• 29th Avenue from Stinson Boulevard to Silver Lake Road <br />• St. Anthony Boulevard from Stinson Boulevard to Kenzie Terrace <br /> <br />Additional improvements for consideration include replacing an existing segment of sanitary sewer on <br />Chandler Road and upgrading the existing Foss Road Lift to accommodate the final development of the <br />Silver Lake Village Area. <br />2.3 DATA AVAILABLE <br />Information and materials used in the preparation of this report include the following: <br />• City of St. Anthony Village Capital Improvement Plan (CIP) <br />• City of St. Anthony Village Record Drawings <br />• City of St. Anthony Village Topographic Maps <br />• Private Utility Maps <br />• Field observations of area <br />• Geotechnical Report prepared by WSB, dated June 2020 <br />• Pavement Coring Forensic Report prepared by WSB, dated June 2020 <br />• Sanitary Sewer Televising Report prepared by Hydro Klean LLC, dated October 2019 <br />• City of St. Anthony Village Assessment Policy, modified in 2020 <br />2.4 PROJECT LOCATION <br />The project includes the following streets: <br /> <br />Street and Utility Improvements: <br /> <br />• Skycroft Drive from 32nd Avenue to 33rd Avenue <br />• Croft Drive from 32nd Avenue to 33rd Avenue <br /> <br /> <br />40
The URL can be used to link to this page
Your browser does not support the video tag.