My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05112021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 05112021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:47:06 PM
Creation date
5/6/2021 2:45:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any residents who have not attended one of the three previous informational meetings can 1 <br />contact Mr. Messner with questions. Some other common construction concerns are electric 2 <br />vehicle needs, special needs/events, sprinkler systems/invisible fencing, mail/garbage service, 3 <br />private utilities, temporary water service, driveway replacement and sump pump connections. 4 <br />Mr. Messner reviewed each of the concerns in detail. 5 <br /> 6 <br />Additional information regarding street reconstruction projects for the City of St. Anthony, by 7 <br />visiting the St. Anthony Village Reconstruction Process webpage located on the City’s website at 8 <br />http://www.savmn.com. 9 <br /> 10 <br />Mr. Messner reviewed project funding along with the assessment policy for street reconstruction, 11 <br />and the assessment policy for mill and overlay. Assessment process follows Minnesota Statute 12 <br />Chapter 429 – Public Improvements. Written objection appeal must be presented in writing and 13 <br />signed by the property owner prior to or at the hearing. Notice of appeal must be filed within 30 14 <br />days after adoption of the assessment. The interest rate is set at the time of assessment 15 <br />certification. Street reconstruction assessments can be paid over a 15-year period. Mill and 16 <br />overlay assessments can be paid over a 10-year period. 17 <br /> 18 <br />Mr. Messner reviewed the Project Schedule in detail. The upcoming schedule dates are May 11, 19 <br />2021 – Award of Bonds; Construction to begin May/June 2021; Substantial Completion 20 <br />September 2021 with final paving in June 2022. 21 <br /> 22 <br />Councilmember Randle asked if a homeowner were to sell their property that was assessed, 23 <br />would the new homeowner need be responsible to pay for that assessment. Mr. Messner stated 24 <br />the assessment stays with the property and would be paid off by the seller during the property 25 <br />sales process. 26 <br /> 27 <br />Mayor Stille stated this is a major shift in doing more to protect the assets we have already 28 <br />reconstructed rather than full reconstruction of the infrastructure. It is important to pay off the 29 <br />assessment by November 30. 30 <br /> 31 <br />Ms. Mary Sledz, 2712 29th Avenue, asked how the overlay was decided on 29th Avenue. Mr. 32 <br />Messner explained the streets are visually inspected annually and the streets needing overlay are 33 <br />determined. He noted that 29th Avenue was reconstructed in 1999 and that pavement is reaching 34 <br />its useful life. Core samples have been taken of the pavement and some stresses have been seen. 35 <br />Ms. Sledz suggested to help with further deterioration 29th Avenue, it should not be a major truck 36 <br />route. Mr. Messner stated that street is a collector road and state aid road and is a suitable truck 37 <br />route. 38 <br /> 39 <br />Mayor Stille closed the public hearing at 8:10 p.m. 40 <br /> 41 <br />A. Resolution 21-042; a Resolution Ordering Improvements for the 2021 Street and Utility 42 <br />Improvements. 43 <br /> 44 <br />Motion by Councilmember Jenson, seconded by Councilmember Walker, to adopt Resolution 45 <br />21-042; a Resolution Ordering Improvements for the 2021 Street and Utility Improvements. 46 <br />3
The URL can be used to link to this page
Your browser does not support the video tag.