My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 11282023
StAnthony
>
City Council
>
City Council Minutes
>
2023
>
CC MINUTES 11282023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 3:01:04 PM
Creation date
12/13/2023 3:00:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />November 28, 2023 <br />Page 3 <br />1 Mr. Messner reviewed the method for selection for Reconstruction Projects includes flood relief <br />2 effort, existing utility deterioration, pavement condition and adjacent infrastructure replacement <br />3 (construction phasing). The method for selection of Mill & Overlay Projects is to maintain and <br />4 extend the life previously reconstructed roadways. The method for selection of Thin <br />5 Maintenance Overlays is a non-structural asphalt layer applied as a maintenance treatment for <br />6 short-term corrective action. <br />8 A list of the locations for the proposed mill and overlay project was provided. The proposed thin <br />9 maintenance overlay will be on 31 s` Avenue NE (Silver Lake Road to Rankin Road). The <br />10 concrete work at Salo Park will replace cracked panels. The total cost for the proposed <br />11 improvements is estimated to be $2,667,600. A map showing the assessed parcels was provided. <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />For Silver Point Park the parking lot mill and overlay, reclaim and pave the trail, replace <br />cracked panels in the concrete and remove and replace the basketball court. These improvements <br />were included with the bid package for cost information and future Council consideration. <br />Mr. Messner reviewed the project schedule with substantial completion being done in September <br />2024. Photographs were provided for Council review. <br />Residents can sign up to receive email and/or text message project status updates by visiting the <br />project webpage located under Government / Projects on the City's website at <br />https://savmn.coAdditional information regarding street reconstruction projects for the City of <br />St. Anthony can be found by visiting the St. Anthony Village Reconstruction Process webpage <br />located under How do I ... /Learn About on the City's website. <br />Councilmember Webster asked since Salo Park is not on City property, but there is a <br />maintenance agreement in place. Mr. Messner stated the agreement includes the City assuming <br />maintenance of the area. Mr. Yunker stated the funds come from the stormwater fund. <br />Councilmember Jenson referred to Silver Point Park and asked when that will be completed, and <br />Mr. Messner stated nothing is planned at this time but was included in the facilities maintenance <br />study. The playground replacement project is still going forward. <br />Mayor Stille stated the street maintenance plan makes sense. <br />Motion by Councilmember Jenson, seconded by Councilmember Walker, for approval of <br />Resolution 23-063 — Accepting Plans and Specifications and Ordering Advertisement for Bids <br />for the 2024 Street Improvement Project. <br />Motion carried 4-0. <br />C. Resolution 23-064 — Ratifvine the 2024 Agreement Between the International <br />Association of Fire Fighters, Local 3486 Representing the St. Anthony Fire Department <br />Employees and the City of St. Anthony Village. <br />
The URL can be used to link to this page
Your browser does not support the video tag.