My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07242007
StAnthony
>
City Council
>
City Council Packets
>
2007
>
CC PACKET 07242007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 10:48:50 AM
Creation date
5/7/2014 2:22:02 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />June 26, 2007 <br />Page 9 <br />2 3. Resolution 07-052; Authorize Plans, Specifications and Ad for Bid for Utility <br />3 Connections along Silver Lake Road <br />4 <br />5 Mr. Hubmer stated this resolution provides for the preparation of plans specifications, and <br />6 advertising for bids for the installation of a new meter boxes and connections for residences <br />7 along Silver Lake Road that currently receive electrical power from overhead lines. Ile stated <br />8 Xcel Energy would relocate the utilities underground to the meter boxes of individual boxes; <br />9 however, a new meter box installation is necessary for the electrical changeover to occur from <br />10 the overhead to underground utilities. <br />11 <br />12 Motion by Councilmember Stille, seconded by Councilmember Thuesen, to approve Resolution <br />13 07-052, a Resolution authorizing the preparation of plans, specifications, and advertising for bids <br />14 for utility connections along Silver Lake Road. <br />15 <br />16 Motion carried unanimously 4/0. <br />17 <br />18 B. Quarterly Goals Update <br />19 <br />20 City Manager Mornson reported on the quarterly goal update. Ile explained equal importance is <br />21 given to each of the five goals. <br />22 <br />23 Goal #1 is the Reconstruction of Silver Lake Road. He pointed out the three resolutions adopted <br />24 started the process. He stated the three actions planned include awarding bids for tree removal <br />25 and utility work at the August meeting, the City is to enter into a contract with Hennepin County <br />26 in September or October 2007, and later this fall, Council will need to authorize Ehlers and <br />27 Associates to enter into the bond process. <br />28 <br />29 Goal 2: Develop a Feasible Broadband Plan. He reported several meetings on broadband have <br />30 been held. Did get report Columbia Telecommunications; however, the council decided it is not <br />31 ready to proceed. He reported Staff is working with North Suburban Telecommunications in a <br />32 joint effort with ten cities and with the League of Minnesota Cities to discuss working together <br />33 on a state-wide broad band. He stated Assistant City Manager Moore -Sykes and <br />34 Councilmember Gray would represent the City on the committee. <br />35 <br />36 Goal 3: Re -Codification of City Ordinances. City Manager Mornson stated the City entered into <br />37 a contract through the League of Minnesota Cities to re -codify the City ordinances. He stated <br />38 Staff might consider adding issues such as updating the housing code goal to include rentals in <br />39 single family residences and sign ordinances. <br />40 <br />41 Goal 4: Identify Environmental Priorities for the City. City Manager Mornson reported the City <br />42 hosted a best management practices for plowing with the Middle Mississippi Water Shed District <br />43 and Public Works from St. Anthony and surrounding cities. He commented a similar event is <br />44 planned for private snow plowers. He reported Staff is also working with the Middle Mississippi <br />45 Water Shed District to monitor storm water at the south end of the City. He stated a feasibility <br />46 study is underway to consider constructing a storm water treatment facility at the south end of St. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.