City Project Update <br /> from City Engineer,David Mitchell <br /> 140th Street and IN 61 Intersection Pelonuin Industrial Park Improvements <br /> Improvements On Monday,May 19,the City Council took J <br /> The City's contractor has completed most of the another necessary step to complete this project. , <br /> required road work on TH 61 in preparation for The previous contractor has been terminated for <br /> installing the traffic signal. Over the course of not completing the work. Bids for the remaining <br /> the next few weeks the traffic signal will be work were opened on June 12,and a new con- <br /> installed. When the signal work nears com- tractor will be selected to complete the work <br /> pletion the surface of"old"TH 61 will be from the bids received. We do not antic- <br /> milled off and a new bituminous surface ipate a significant amount of work in <br /> Y Y in order <br /> the area before earl Jul <br /> will be placed over the roadway <br /> through the intersection. New to provide the new contractor <br /> striping will be placed that is time to dewater the site and <br /> consistent with the new . A Dmobilize special equip- <br /> design of the intersection. ment to the project. <br /> Completion of the prof- : We anticipate the <br /> ect is anticipated in early project being complet- <br /> WORK <br /> summer. ed early this fall. <br /> Judicial Ditch No.2 Related to this project, <br /> HEA <br /> The contractor working for Rice the City Council authorized <br /> Creek Watershed District to replace the temporary paving of <br /> culverts on Judicial Ditch No.2 under Hardwood Creek Trail in the dis- <br /> 157th Street, 165th Street,and 170th turbed area south of 159th Street <br /> Street(County Road 4)has completed the North. This area has now been paved <br /> culvert installations at the three locations. Work along the temporary alignment that is cur- Anyone Who Is <br /> to install guard rails at 157th Street remains,but rently being used. This area will be restored to <br /> the road is open to traffic. The contractor will be its original condition when the utility work is interested in <br /> doing some corrective work at 165th Street in completed under TH 61. <br /> selling land to <br /> the near future. When the corrective work is <br /> completed,a guard rail will be installed on the the City of Hugo <br /> north side of 165th Street in this location. is asked to <br /> contact City <br /> Administrator <br /> City Looking to Acquire Mike Ericson at <br /> Land for Parks City Nall or <br /> Parks <br /> The City of Hugo would like to acquire land for neighborhood parks,active recreational areas,and Commission <br /> open spaces. "We are primarily interested in land located in the central portion of the City," explains <br /> Community Development Director John Rask, "but we wouldn't rule out any parcel of 20 to 100 member Pete <br /> acres suitable for active recreation purposes." Funds for purchasing this land come from the City's <br /> park dedication fund,which is obtained from new development in the City. A$1,800 fee is collected Pedersen at <br /> and deposited into this fund when new residential lots are created. Anyone who is interested in sell- 651-426-4126. <br /> ing land to the City of Hugo is asked to contact City Administrator Mike Ericson at City Hall or <br /> Parks Commission member Pete Pedersen at 651-426-4126. <br />