My WebLink
|
Help
|
About
|
Sign Out
Home
2017.08.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.08.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 3:03:17 PM
Creation date
8/8/2017 2:53:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/7/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XCEL Site Plan- Phase 4 <br />Page 2 <br />The addition will be used for indoor training exercises to compliment the electric and gas field <br />training. The transmission substation department will utilize the addition to train crews on <br />substation and transmission line equipment year-round. The larger open area is utilized for <br />hands-on training such as breaker maintenance, smaller transformers, load tap changers, direct <br />transfer trip schemes and relay packages. The remaining space is the substation simulator area <br />that will be utilized for hands-on training for more specialized and sensitive equipment. The <br />addition will also be use for training on the overall power grid as well as equipment that would <br />normally be found in a substation control house, relay panels, remote terminal units, local control <br />units, and transmission control panels. <br />The site plan shows an expanded location northwest of the building for small house simulators <br />for gas leak training. This will allow training for commercial and residential simulation of gas <br />leak detection and repair. The plan shows that there will be 16 house/building simulators on site <br />and each simulator will be approximately 100 square feet. Although the design of the house <br />simulators has not been finalized, the applicant has stated they will be designed like typical <br />residential sheds. Staff has included a condition in the resolution that the final design and <br />location of the house simulators shall be reviewed and approved by staff prior to installation. <br />There have been modifications to the previously approved site plans to account for the addition <br />to meet applicable zoning requirements. The applicant has stated that there is potential for fature <br />phases. Each phase will be required to formally apply for site plan approval for consideration by <br />the Planning Commission and City Council. The full build out of the site plan proposed will <br />include approximately 53,000 square feet of building. <br />3. CONTEXT: <br />A. Surrounding Land Use and Zoning <br />The properties to the south are zoned Planned Unit Development (PUD) and are occupied by <br />townhome developments. The properties to the east and north are zoned General Industrial (I-3) <br />and are occupied by industrial businesses and a vacant parcel. The property to the west is zoned <br />Large Lot Single Family Residential (R-1) and is occupied by the City owned Clearwater Creek <br />Preserve Park. <br />B. Existing Site Characteristics <br />The training center is currently constructed on the property. Wetlands and wooded areas are <br />located on the south and west sides of the property. <br />4. ANALYSIS: <br />A. Level of City Discretion in Decision -Making <br />The City's discretion in approving or denying a site plan is limited to whether or not the <br />proposed project complies with the Comprehensive Plan and Zoning Ordinance requirements. If <br />it meets these standards, the City must then approve the site plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.