My WebLink
|
Help
|
About
|
Sign Out
Home
2017.10.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.10.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2017 1:39:53 PM
Creation date
10/4/2017 9:26:14 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/2/2017
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GSA14 •anti cipa in 1 1 <br />access contFol. implementation of these mitigation measuFes along ElnieFest <br />Avenue would r-equiFe eE)E)peFat_J_A_ Mbetv.xeen the City of Hugo and the City o <br />Line La This / has been completed <br />52. All intersection improvements will be designed in a manner to ensure a level of <br />service (LOS) D or better. Furthermore, turn lane queue lengths will be <br />designed and constructed with adequate capacity to ensure minimal <br />interference and disruption for through lane operations. This activity is <br />ongoing. <br />53. Construction of local collector streets and frontage/backage roads will minimize <br />the need for local trips on regional arterials such as TH 61 and CSAH 8. <br />Collector roadways will need to be improved or constructed based on the <br />timing and location of specific development. The City of Hugo will continue to <br />monitor traffic volumes and traffic operations to determine when additional <br />improvements will be necessary. This activity is ongoing. <br />54. Construct the north -south collector street between 165th Street and the <br />extension of 147th Street as a two-lane roadway. Additional capacity <br />requirements may be necessary at the southern end of the roadway where daily <br />traffic volumes are forecast to be 12,000 - 15,000. Oneka Parkway has been <br />constructed between CSAH 8/Frenchman Road and 159th Street. <br />55. COMPLETED: r„n-str,,,.t the east west collea,.t„r Street (extension of 1591h <br />CtFeet) between Highway 61 a -p -d EIM-eroct Avenue as a 0.,A-4ane readway. This <br />has been completed, although the roadway changes to Heritage Parkway <br />and is not a direct extension of 159th. <br />56. The City of Hugo will continue to support improvements along TH 61 including <br />intersection improvements, safety improvements, and capacity improvements. <br />Such improvements would add needed capacity and safety improvements to <br />accommodate Mn/DOT's Transportation Studies Plan (TSP) that lists TH 61 as a <br />Preservation Corridor. No additional public access points are being requested <br />along TH 61 as a result of the proposed development within the Everton Avenue <br />AUAR study area. The access and corridor plan has been completed with <br />MnDOT, Washington County, Washington County Rail Authority, and the City <br />for TH 61 corridor within Hugo. <br />57. Currently, there are no transit routes utilizing any of the roadways within the <br />study area. There is a park -n -pool lot located near CSAH 8/14 and I -35E in the <br />City of Lino Lakes. As development in the Everton Avenue AUAR study area and <br />Final Alternative Urban Areawide Review Update Page 11 <br />Everton Avenue Neighborhood <br />City of Hugo, MN <br />WSB Project No. 10373 <br />September 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.