Laserfiche WebLink
■ <br />WSB <br />477 Temperance Street I St. Paul, MN 55101 1 (651) 286-8450 <br />March 17, 2017 <br />Ms. Rachel Juba, City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Preliminary Plat/Preliminary PUD Review <br />Adelaide Landing <br />WSB Project No. 3288-04 <br />Dear Ms. Juba: <br />We have reviewed the Preliminary Plat/PUD submittal and drainage analysis for the above -referenced <br />project. In particular, we have reviewed the following plans related to this particular request: <br />• Preliminary Plat, Grading, Streets, Utilities, and Landscaping Plans prepared by Westwood <br />Professional Services, dated February 5, 2017. <br />• Preliminary Stormwater Runoff Narrative prepared by Westwood Professional Services, <br />dated February 6, 2017. <br />Based on the review of the application materials, we offer the following comments related to this <br />application: <br />Roadways and Access <br />1. The plan includes adequate roadway right of way and roadways and sidewalks/trails meet City <br />standards for width and design within the extents of the residential development. <br />2. The development is bordered by 130th Street on the south where the proposed development will have <br />three access locations. Internal roadway connections are also proposed at the existing 137th Street <br />that extends west to Trunk Highway 61, 135th Street that extends easterly towards Egg Lake Road <br />and Flay Avenue that extends northerly towards Egg Lake Road. <br />3. The proposed development consists of 319 lots, with seven (7) of these lots being developed by <br />others in the future (southeast corner of development). The initial phase consists of approximately 54 <br />lots that will access 130th Street. Subsequent phases continue in the southern portion of the sight <br />that will also access 130th Street. As development continues northward on the site in later stages of <br />the development, connection to 135th Street, Flay Avenue, and 137th Street will take place. <br />4. The plans include roadway extensions that will allow future roadway access to the property east of <br />the plat area just north of 130th Street. <br />5. 130th Street will require improvements to accommodate this development and to address <br />deteriorating roadway conditions. Staff is evaluating options for improving 130th Street that include <br />the following: <br />• addition of intersection improvements that could include a roundabout located at Flay <br />Avenue and Street 5 <br />• turn lanes located at street 12 <br />• reconstruction of the roadway to an urban section from TH 61 to Goodview Avenue <br />• 8-ft pedestrian trail along the north side of 130th Street, as identified in the Parks, Trails and <br />Open Space Plan. <br />• Pedestrian crossings of 130th Street in select locations <br />Building a legacy — your legacy. <br />Equal Opportunity Employer I wsbeng.com <br />K:\03288-040\Admin\Docs\LTR-rjuba-Adelaide Landing Prelim Plat-PUD 031717 kkp.docx <br />