My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 3:03:18 PM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br /> March 17, 2017 <br /> Page 2 <br /> 6. 130th Street is identified as a potential project in a future year, and some level of City financial <br /> participation is reasonable. The specific timing for the improvements, along with the cost share, will <br /> be included in the Development Agreement. <br /> 7. Streets 1 & 2 will cross a private ditch. The specific design of the crossing is dependent upon the <br /> hydraulic needs related to the ditch itself. We are currently collaborating with the applicant to develop <br /> a preliminary design for the crossing/culvert, and ultimately develop a final design and secure a <br /> permit from the RCWD. <br /> 8. A detailed traffic analysis was completed as part of the EAW. The results of the EAW indicate the <br /> development can be accommodated, provided a number of improvements to 130th Street are <br /> completed. The existing signal timing at TH 61 and 130th Street will also require monitoring, with <br /> potential changes made by MnDOT. <br /> Grading, Drainage, and Wetlands <br /> 9. The property includes 57.7 acres of wetlands, which have been delineated and approved by the City <br /> as LGU. The proposed development does result in 1.34 acres of wetland impact that is proposed to <br /> be impacted through wetland bank replacement. A wetland replacement application has been <br /> submitted for review. A TEP meeting will be scheduled in the near future and the notice of decision <br /> will ultimately require City Council approval. <br /> 10. Within the development there is a network of trails that do include four wetland crossings. The <br /> crossings are proposed to be boardwalks designed to qualify for no wetland loss. Staff will continue <br /> to work with the applicant on the boardwalk design. The elevated boardwalk will maintain the 8-foot <br /> width to be consistent with the trail widths throughout the development. <br /> 11. The City will review and issue a stormwater management permit for the development. The plans <br /> include managing stormwater through a combination of ponds and a stormwater reuse system. The <br /> design is consistent with stormwater rules as proposed, and we will work with the applicant to finalize <br /> the plans and issue a stormwater permit as the project moves forward. <br /> 12. Any fill placed in the floodplain requires compensatory storage to mitigate filling within the 100-year <br /> floodplain. The applicants provided detailed documentation depicting the existing and proposed <br /> floodplain, and we will continue to work directly with the applicant to finalize the details. A Letter of <br /> Map Revision will need to be prepared and submitted for FEMA approval so that the existing <br /> floodplain boundaries and elevations can be revised. <br /> 13. There are a number of Outlots included as part of the plat. Outlots that contain stormwater ponds <br /> and/or park should be deeded to the City; the remainder of the Outlots should include drainage and <br /> utility easements. <br /> 14. The plans include the installation of a stormwater reuse system to be utilized to irrigate common <br /> areas, park areas and individual lots within the development. The system is feasible from a water <br /> availability and equipment standpoint. We will finalize the technical details as the project moves <br /> forward. Of note regarding the system are the following: <br /> • The system will be installed by the applicant and pumps and mainlines owned, operated, and <br /> maintained by the homeowner's association. <br /> • The system will be a part of the overall stormwater management improvements to be <br /> included as part of the stormwater permit. The HOA documents will include provisions that <br /> will allow the City to operate the system in the event that it is necessary to maintain <br /> compliance with the stormwater permit. The provisions will include an ability to assess any <br /> City costs associated with operation and maintenance of the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.