My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 3:03:18 PM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br /> March 17, 2017 <br /> Page 3 <br /> • We are working with the applicant to determine whether or not the water reuse system will <br /> generate stormwater management credits beyond those required to meet their own permitting <br /> requirements. The City should include in its use agreement with the HOA that excess credits <br /> generated are the property of the City. <br /> Utilities <br /> 15. Water service is available to the property via existing watermain connection points adjacent to the <br /> property. The water system will be looped through the proposed development, and be extended to <br /> plat boundaries to allow for extension in the future. <br /> 16. The development will include some trunk watermain consistent with the City's Comprehensive Water <br /> Supply Plan. Any trunk watermain installed as part of the project will be eligible for oversizing credit, <br /> which will be addressed in the Development Agreement. <br /> 17. The sanitary sewer will be connected to the existing system to provide sewer service to the <br /> development, which is generally consistent with the City's Comprehensive Plan. The proposed plan <br /> will require adjustments to the sewer service areas, which is reasonable with a minor modification to <br /> an existing forcemain, which extends from the lift station on 130th Street. The forcemain will be <br /> improved as part of the 130th Street improvements, with the Developer funding a portion of the cost. <br /> This will be outlined in the Development Agreement. <br /> 18. Water and Sewer trunk fees will apply to the project, and will be reviewed as the project moves <br /> forward. <br /> 19. Existing private utilities extend through the site. Xcel Energy has overhead transmission line <br /> extending through the site (east/west) and Koch pipeline has an underground pipeline extending <br /> through the site. The applicant will need to provide documentation from Xcel Energy and Koch <br /> indicated any restrictions there are within their easements. <br /> Thank you for the opportunity to provide comments on this project. If you have any questions, please do <br /> not hesitate to contact me at 651-286-8463. <br /> Sincerely, <br /> WSB&Associates, Inc. <br /> •'6// d F'Ie� <br /> Mark Erichson, PE <br /> City Engineer <br /> cc: Steve Duff, Senior Engineering Technician (email only) <br /> Deb Ridgeway, The Excelsior Group (email only) <br /> Corey Meyer, Westwood Professional Services (email only) <br /> Ann Pung-Terwedo, Washington County Public Works (email only) <br /> Katy Thompson, Water Resource Engineer(email only) <br /> Stephanie Hatten, Water Resource Engineer(email only) <br /> Tony Havranek, LGU Coordinator(email only) <br /> Kris Keller, Plan Review Specialist (email only) <br /> kkp <br />
The URL can be used to link to this page
Your browser does not support the video tag.