My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 07.27.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 07.27.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:43:12 AM
Creation date
12/10/2018 8:31:36 AM
Metadata
Fields
Template:
Commissions
Meeting Date
7/27/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />July 7, 2017 <br />Page 2 <br />6. The remaining 0.73 acres of impervious area will be treated with the construction of a new <br />pretreatment and infiltration basin located in the northwest corner of the site. Staff will continue to <br />work with the applicant on the size and location of the stormwater facilities on site and determine if it <br />make sense to expand the existing basin rather than create an additional basin. <br />In the stormwater narrative, the applicant states that rate control for the site will be provided by an <br />existing downstream drainage system. However, the proposed infiltration basin outlets at 2.96 cfs for <br />the 100 -year storm as proposed. The City of Hugo limits the discharge rates to 0.1 cfs/acre of total <br />project size for the 100 -year event. The previously -approved Phase 3 submittal listed an overall <br />project area of roughly 12 acres, which would limit the 100 -year peak flow to 1.20 cfs. As or000sed. <br />the peak flow out of the proposed infiltration basin is not compliant with the City of Hugo's <br />Comprehensive Stormwater Management Plan (Section N.A.16), <br />Wetlands <br />8. No wetland impacts are proposed as part of the Phase 4 improvements. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />cc: Steve Duff, Senior Engineering Technician (email only) <br />Stephanie Hatten, Water Resource Engineer (email only) <br />
The URL can be used to link to this page
Your browser does not support the video tag.