My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 08.07.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 08.07.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:45:52 AM
Creation date
12/10/2018 8:32:30 AM
Metadata
Fields
Template:
Commissions
Meeting Date
8/7/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />Grading and Stormwater Management <br />The grading for the site was partially completed with the previous phases of development. There <br />will be an expansion of an existing pond on site. The pond has an outlet to the east that drains <br />into Clearwater Creek Preserve Park that has caused some flooding. The City is working with the <br />development team to correct this problem. <br />Park Dedication <br />The remaining lots will be required to pay the full park dedication fee of $88,800 (37 lots x <br />2,400). <br />5. CONCLUSION: <br />The site is currently within the Fable Hills PUD and the plan layout maintains a development <br />pattern that complies with the approvals for the Fable Hill PUD. <br />Staff has reviewed the PUD amendment and preliminary plat for consistency with the standards <br />outlined in the City Code and finds that the application is consistent with all the standards, except <br />as outlined in the report and included as recommended conditions. <br />6. RECOMMENDATION: <br />Staff recommends approval of the amendment to the preliminary plat and PUD, subject to the <br />conditions listed in the resolution. <br />ATTACHMENTS: <br />1. Resolution Approving the Amendment to the Preliminary Plat and PUD <br />2. Previously Adopted Resolution 2015-29 <br />3. Location Map <br />4. Engineers Memo dated July 31, 2017 <br />5. Applicants Narrative <br />6. Previously Approve Preliminary Plat <br />7. Proposed Preliminary Plat Graphics, dated June 26, 2017 <br />8. Building Elevations <br />
The URL can be used to link to this page
Your browser does not support the video tag.