My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.02.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:34:15 PM
Creation date
2/4/2019 6:30:16 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/4/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(hftp://www.epa.gov/npdes/pubs/measurablegoaIs.pdf). <br />If you have more than five categories, hit the tab key after the last line to generate a new row. <br />Established BMP categories <br />Measurable goals and timeframes <br />Visual inspection <br />100% of MS4 Structural Pollution Control yearly, outfalls ponds <br />once per permit cycle <br />Alerts from the public <br />As they happen <br />Building inspectors <br />Certified erosion control site management <br />BMP categories to be implemented <br />Measurable goals and timeframes <br />Set up automated email notification I Track violations electronically 2014 <br />based on land use for potential illicit discharge ( industrial <br />Determine Priority areas commercial) <br />4. Do you have procedures for record -keeping within your Illicit Discharge Detection and Elimination (IDDE) program as <br />specified within the Permit (Part III.D.3.h.)? ® Yes ❑ No <br />f If you answered no, indicate how you will develop procedures for record -keeping of your Illicit Discharge, Detection and <br />Elimination Program, within 12 months of the date permit coverage is extended: <br />5. Provide the name or the position title of the individual(s) who is responsible for implementing and/or coordinating this <br />MCM: <br />Senior Engineering Technician <br />D. MCM 4: Construction site stormwater runoff control <br />1. The Permit (Part III.D.4) requires that, within 12 months of the date permit coverage is extended, existing <br />permittees shall <br />revise their current program, as necessary, and continue to implement and enforce a construction site stormwater runoff <br />control program. Describe your current program: <br />plan review prior to construction preconstruction meeting prior to construction site visit as BMPs are installed <br />Weekly site <br />inspection on City owned projects monthly or after rain events larger then 112" on private developments <br />2. Does your program address the following BMPs for construction stormwater erosion and sediment control as required in <br />the Permit (Part III.D.4.b.): <br />a. Have you established written procedures for site plan reviews that you conduct prior to the start of <br />® Yes ❑ No <br />construction activity? <br />b. Does the site plan review procedure include notification to owners and operators proposing <br />® Yes ❑ No <br />construction activity that they need to apply for and obtain coverage under the MPCA's general <br />permit to Discharge Stormwater Associated with Construction Activity No. MN R100001? <br />c. Does your program include written procedures for receipt and consideration of reports of <br />® Yes ❑ No <br />noncompliance or other stormwater related information on construction activity submitted by the <br />public to the permittee? <br />d. Have you included written procedures for the following aspects of site inspections to determine <br />compliance with your regulatory mechanism(s): <br />1) Does your program include procedures for identifying priority sites for inspection? <br />® Yes ❑ No <br />2) Does your program identify a frequency at which you will conduct construction site <br />® Yes ❑ No <br />inspections? <br />3) Does your program identify the names of individual(s) or position titles of those responsible for <br />® Yes ❑ No <br />conducting construction site inspections? <br />4) Does your program include a checklist or other written means to document construction site <br />® Yes ❑ No <br />inspections when determining compliance? <br />e. Does your program document and retain construction project name, location, total acreage to be <br />® Yes ❑ No <br />disturbed, and owner/operator information? <br />f. Does your program document stormwater-related comments and/or supporting information used to <br />® Yes ❑ No <br />determine project approval or denial? <br />www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5131113 Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.