My WebLink
|
Help
|
About
|
Sign Out
Home
2019.03.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.03.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:16:18 PM
Creation date
3/18/2019 10:13:51 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Response: This GIS data has been packaged and is ready for upload to the Metropolitan Council <br />server when the plan is resubmitted. <br />Summary of Comments for Completeness: Copy of intercommunity service agreements entered into with <br />an adjoining community, including a map of areas covered by the agreement. <br />City Response: Not applicable. <br />Summary of Comments for Completeness: Table or tables that provide the following local system <br />information: <br />o Hydraulic capacity of each trunk sewer serving each sanitary sewer district. <br />o Assignment of 2040 growth forecasts by Metropolitan interceptor facility. <br />City Response: The trunk sewer capacity analysis has been included within the Comprehensive Sanitary Sewer Plan. <br />The assignment of 2040 growth forecasts by Metropolitan interceptor facility has been provided, as noted above. <br />Summary of Comments for Completeness: Define your community's goals, policies, and strategies for <br />preventing and reducing excessive inflow and infiltration (1/1) in the local municipal and private sanitary <br />sewer systems. <br />o The Plan should include a goal for 1/1 reduction. This could include a target percentage <br />for annual or peak 1/1, or a qualitative goal of decreasing levels with new development, <br />orother. <br />City Response: A qualitative description of /// goals, policies, and strategies was included in the /// section. <br />Summary of Comments for Completeness: Describe the sources, extent, and significance of existing inflow <br />and infiltration in both the municipal and private sewer systems. <br />o Include a description of the existing sources of 1/1 in the municipal and private sewer <br />infrastructure. <br />■ The Plan should include at least a narrative of known or suspected sources of <br />1/1 for both public and private sources. <br />o Include a cost summary for remediating the 1/1 sources identified in the community. If <br />previous 1/1 mitigation work has occurred in the community, include a summary of <br />flow reductions and investments completed. If costs for mitigating 1/1 have not been <br />analyzed, include the anticipated wastewater service rates or other costs attributed <br />to inflow and infiltration. <br />■ The Plan should include costs for identifying and removing sources of 1/1. <br />City Response: An evaluation of existing /// was provided in the /// Analysis section. <br />Summary of Comments for Completeness: Describe the implementation plan for preventing and <br />eliminating excessive inflow and infiltration from entering both the municipal and private sewer <br />systems. <br />o Plan should include expected costs for 1/1 reduction, and a tentative schedule. This <br />may include a brief description of future studies expected to be completed. <br />Corrin Wendell 12 <br />March 4, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.