Laserfiche WebLink
Hugo City Council Meeting Minutes for January 6, 2020 <br />Page 9 of 11 <br /> <br />subdivision. The property is located in the Future Urban Service Area and consists of four <br />parcels totaling 51.1 acres. There are wetlands and floodplain on the property, leaving a total <br />buildable acreage of 29.5 acres. The preliminary plat would include 93 single family residential <br />lots and three outlots to be known as “Rice Lake Reserve”. <br /> <br />Community Development Director Rachel Juba reviewed the plan showing access to Goodview <br />Avenue with the street meandering through the site to Egg Lake Road (CSAH8). The phases of <br />development would start on the west side and move to the east. A sidewalk was shown on all the <br />streets in the development and a trail that would connect to a future trail on Goodview and <br />County Road 8 as shown in the 2040 plan. Also shown on the plans were ponds for storm water <br />management that would be used for storm water reuse in the development. Juba talked about the <br />proposed master homeowners association in the development that will own and maintain the <br />water reuse system and common areas. An architectural review committee will also be <br />established. Juba showed where some of the adjacent lots were ghost platted to show street <br />connections, but it had not been reviewed by staff. <br /> <br />Juba explained, through the PUD process, the applicant was requesting flexibility in lot sizes, <br />reduced lot widths, setbacks, impervious surface and shoreland regulations. She noted the <br />proposed density still met the ordinance standards. In exchange for the flexibility, they would <br />preserve wetlands and natural areas on the site and install trails that overlook natural areas. The <br />developer also planned for a stormwater reuse irrigation project and would incorporate <br />architectural design guidelines for the homes. Juba provided background on the December 19, <br />2019, Planning Commission meeting where a public hearing was held to consider the request. No <br />one spoke at the hearing except the applicant. The Planning Commission, with a vote of 5-1, <br />made a recommendation to approve the PUD and preliminary plat, subject to the conditions <br />listed in the resolution, and a revision that a neighborhood gathering space be located in the area <br />south of the lift station (central to the development), with at least one lot being removed for its <br />placement. The applicant had agreed to revise the plans to meet the conditions. <br /> <br />Juba talked about the styles of homes proposed for the development explaining it would be a <br />villa style product with one level living and a loft option. There were also plans for some two- <br />story homes. She stated staff felt the applicant had done good job with the landscape plan, which <br />included a monument sign and lift station, and she explained the additional landscaping <br />requirements included in the approving resolution. She talked about previous discussions with <br />the applicant on a gathering space that would provide some open space in exchange for the <br />reduced lot widths and setbacks. The Parks commission considered the plan at their meeting in <br />November and recommended not accepting land as park dedication and accept the fee instead. <br />The plan had been revised to show three lots in place of the gathering space. The Planning <br />Commission, at their December meeting, recommended the gathering space be in a more central <br />location on the plan with one lot being removed, and this was included as part of approval. Juba <br />concluded by stating staff found the PUD and Preliminary Plat met all the conditions necessary <br />for approval. <br /> <br />Council asked questions relating to housing types, lot sizes, and pricing. They talked about <br />similar developments with the same lot sizes and villa products, and the need to be able to <br />provide all types of housing to people in all different financial circumstances.