Laserfiche WebLink
<br />Adelaide Landing 4th Addition 19 <br /> <br />8. The plat shall comply with the City’s street naming system. <br /> <br />9. The landscaping planned for the plat shall be installed in one phase. The developer shall <br />take proper precautions to protect the trees as the homes are being built. <br /> <br />10. Each home shall include a minimum of 2 parking spaces within the driveway. The <br />driveway widths shall be a maximum of 24 feet at the right of way line. <br /> <br />11. Staff will continue to work with the applicant on the street lighting plan. Exact locations <br />of the street lights shall be reviewed and approved by staff prior to installation. <br /> <br />12. The developer shall obtain all necessary local, state, and federal permits. <br /> <br />13. Prior to recording the final plat: <br /> <br />a) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br /> <br />b) The developer shall pay $22,560 ($1,128 per unit) in full to satisfy the required <br />cash in lieu of parkland dedication requirement. The applicant will continue to <br />discuss with staff and the Parks Commission improvements to the park that may <br />reduce the required park dedication fee for the development. <br /> <br />c) The developer shall pay the sewer and water trunk fees for each lot at final plat. <br />The City’s SAC and WAC fees will be paid at the time building permits issued. <br /> <br />d) The developer shall obtain approval from Xcel Energy on the crossing of the <br />powerline easement. <br /> <br />e) The developer shall obtain approval from Koch on the crossing of the gas line <br />easement. <br />