My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Adelaide Landing 4th Addition 19 <br /> <br />8. The plat shall comply with the City’s street naming system. <br /> <br />9. The landscaping planned for the plat shall be installed in one phase. The developer shall <br />take proper precautions to protect the trees as the homes are being built. <br /> <br />10. Each home shall include a minimum of 2 parking spaces within the driveway. The <br />driveway widths shall be a maximum of 24 feet at the right of way line. <br /> <br />11. Staff will continue to work with the applicant on the street lighting plan. Exact locations <br />of the street lights shall be reviewed and approved by staff prior to installation. <br /> <br />12. The developer shall obtain all necessary local, state, and federal permits. <br /> <br />13. Prior to recording the final plat: <br /> <br />a) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br /> <br />b) The developer shall pay $22,560 ($1,128 per unit) in full to satisfy the required <br />cash in lieu of parkland dedication requirement. The applicant will continue to <br />discuss with staff and the Parks Commission improvements to the park that may <br />reduce the required park dedication fee for the development. <br /> <br />c) The developer shall pay the sewer and water trunk fees for each lot at final plat. <br />The City’s SAC and WAC fees will be paid at the time building permits issued. <br /> <br />d) The developer shall obtain approval from Xcel Energy on the crossing of the <br />powerline easement. <br /> <br />e) The developer shall obtain approval from Koch on the crossing of the gas line <br />easement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.