My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 05.28.20
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2020 PC Packets
>
PC Packet 05.28.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2020 4:21:53 PM
Creation date
8/6/2020 4:16:47 PM
Metadata
Fields
Template:
Commissions
Meeting Date
5/28/2020
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />May 21, 2020 <br />Page 2 <br />Drainage and Utility Easements over watermain and wetlands will be required to remain in <br />place. Staff will work with the applicant how on best to proceed with addressing this item. <br />9. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br />Stormwater Manaaement <br />10. The site for this development had stormwater management accommodated for in a regional <br />stormwater basin as part of the Victor Gardens Development. A storm sewer pipe was <br />extended into the property from Victor Path to collect stormwater from the site and drain it to <br />the regional stormwater basin. The applicant has surveyed the existing regional stormwater <br />pond to confirm capacity <br />11. Stormwater plan and model comments have been provided to applicant and will need to be <br />addressed in future submittals for documentation and permitting purposes. <br />Wetland <br />12. A wetland delineation has been completed and a Technical Evaluation Panel meeting will <br />take place the week of May 251" to review the location of the wetland west of the proposed <br />improvements. Currently, there are no proposed impacts based on the wetland delineation <br />submitted. <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />Mark Erichson, PE <br />City Engineer <br />cc: Scott Anderson, Public Works Director (email only) <br />Liz Finnegan, Senior Engineering Technician (email only) <br />Kendra Lindahl, Landform (email only) <br />
The URL can be used to link to this page
Your browser does not support the video tag.