Laserfiche WebLink
Ms. Rachel Juba <br />May 21, 2020 <br />Page 2 <br />Drainage and Utility Easements over watermain and wetlands will be required to remain in <br />place. Staff will work with the applicant how on best to proceed with addressing this item. <br />9. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br />Stormwater Manaaement <br />10. The site for this development had stormwater management accommodated for in a regional <br />stormwater basin as part of the Victor Gardens Development. A storm sewer pipe was <br />extended into the property from Victor Path to collect stormwater from the site and drain it to <br />the regional stormwater basin. The applicant has surveyed the existing regional stormwater <br />pond to confirm capacity <br />11. Stormwater plan and model comments have been provided to applicant and will need to be <br />addressed in future submittals for documentation and permitting purposes. <br />Wetland <br />12. A wetland delineation has been completed and a Technical Evaluation Panel meeting will <br />take place the week of May 251" to review the location of the wetland west of the proposed <br />improvements. Currently, there are no proposed impacts based on the wetland delineation <br />submitted. <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />Mark Erichson, PE <br />City Engineer <br />cc: Scott Anderson, Public Works Director (email only) <br />Liz Finnegan, Senior Engineering Technician (email only) <br />Kendra Lindahl, Landform (email only) <br />