My WebLink
|
Help
|
About
|
Sign Out
Home
2020.11.16 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.11.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:29:38 PM
Creation date
11/23/2020 3:45:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/16/2020
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Rice Lake Reserve 18 <br />6. The developer shall design and install a stormwater re-use system for irrigation of the <br />individual lots. <br /> <br />7. The developer shall establish a property owners association for the development to <br />own/operate/maintain common elements, landscaping, and the water re-use system. The <br />property owners association documents shall be reviewed and approved by staff prior to <br />recording the plat. <br /> <br />8. The plat shall comply with the City’s street naming system. <br /> <br />9. The landscaping planned for the plat shall be installed in one phase. The developer shall <br />take proper precautions to protect the trees as the homes are being built. <br /> <br />10. Each home shall include a minimum of 2 parking spaces within the driveway. The <br />driveway widths shall be a maximum of 24 feet at the right of way line. <br /> <br />11. Staff will continue to work with the applicant on the street lighting plan. Exact locations <br />of the street lights shall be reviewed and approved by staff prior to installation. <br /> <br />12. The developer shall obtain all necessary local, state, and federal permits. <br /> <br />13. The developer shall make contact with adjacent property owners, prior to grading the <br />property. <br /> <br />14. Prior to recording the final plat: <br /> <br />a) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br /> <br />b) The developer shall pay $100,800.00 in full to satisfy the required cash in lieu of <br />parkland dedication requirement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.