Ms. Rachel Juba <br />September 17, 2020 <br />Page 2 <br />existing watermain line and will need to be moved which may modify the amount of credits <br />required. <br />Rate control is proposed to be met by the biofiltration basins and a dry basin onsite. The site <br />is currently not meeting the City's 100-year rate control limitation of 0.1 cubic feet per second <br />per acre of drainage, but we are working with the applicant with regards to modifications to <br />their proposed plan. <br />Staff is also working with the applicant to ensure freeboard from the HWL is met. <br />Additional stormwater plan and model comments have been provided to applicant and will <br />need to be addressed in future submittals for documentation and permitting purposes. <br />A stormwater maintenance agreement and drainage and utility easements will be required <br />for the stormwater basins on the site. <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB <br />Mark Erichson, PE <br />City Engineer <br />cc: Scott Anderson, Public Works Director (email only) <br />Liz Finnegan, Senior Engineering Technician (email only) <br />