Laserfiche WebLink
<br /> <br /> <br />Geotechnical Report <br />2021 Street Improvements <br />Hugo, Minnesota <br />WSB Project No. 015887-000 Page 5 <br /> <br />The shallow groundwater could present an issue to excavations and pla cement of utilities. <br /> <br />The bore holes were only left open a short period of time, and groundwater levels may not have <br />stabilized. However, given the predominate sand subsurface conditions it is our opinion that the water <br />levels measured in our borings likely correspond to the groundwater level. <br /> <br />