My WebLink
|
Help
|
About
|
Sign Out
Home
2021.05.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.05.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:32:18 PM
Creation date
7/19/2021 4:31:45 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/17/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo City Council Meeting Minutes for May 3, 2021 <br />Page 5 of 7 <br /> <br />opening on June 15, contract awarded at the June 21 meeting, and construction starting in July, <br />2021. <br /> <br />Klein made motion, Miron seconded, to approve RESOLUTION 2021-32 APPROVING <br />PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS <br />FOR THE NEW PAVILION AT LIONS PARK. <br /> <br />Roll call vote - all ayes. Motion carried. <br /> <br />Approve Advertisement for Bids for CSAH 8 Water Reuse Project <br /> <br />City Engineer Mark Erichson provided background stating WSB had previously been directed to <br />prepare plans and specifications for the CSAH 8 Stormwater Reuse Project. He showed the area <br />to be served with the water reuse project saying the plan was to pump water from the stormwater <br />pond located in the NW quadrant of CSAH 8 and Oneka Parkway to the existing irrigation <br />system along CSAH 8 and future irrigation system to be constructed as part of the Lions Park <br />Redevelopment Project and the 2021 Downtown Improvement Project. The project would <br />conserve an estimated 14 million gallons of water annually. Plans and Specifications had been <br />prepared and were ready to be advertised for bidding. The total project cost was $729,000, and <br />Erichson was pleased to announce the City had already received grants for 85% of the cost, and <br />$76,000 in grant funds was still pending. He stated the schedule was similar to the other projects <br />with the contract to be awarded at the June 21, 2021, meeting. <br /> <br />Miron asked if any disruptions were expected along the CSAH 8 corridor. Erichson replied that <br />there would be work within in the right-of-way, but no road closures were expected with the <br />project. <br /> <br />Haas made motion, Klein seconded, to approve RESOLUTION 2021-33 APPROVING PLANS <br />AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE CSAH <br />8 STORMWATER REUSE PROJECT. <br /> <br />All Ayes. Motion carried. <br /> <br />Approve Resolution Declaring Council Vacancy and Approving Appointment Process <br /> <br />At its April 19, 2021, meeting, Council Member Haas announced his retirement effective May <br />31 after over 22 years on the Council. His term was to expire on December 31, 2021. Staff was <br />directed to draft an appointment process to fill the vacancy and bring it back to Council for <br />approval. City Administrator Bryan Bear explained the process as outlined in State Statute to fill <br />the vacancy by council appointment until an election is held. A special election was not required <br />if there was less than two years of the term remaining. He explained the qualifications that <br />included residency in Ward 3. Applications were due by Wednesday, May 19, and an <br />appointment could be made at the first meeting in June and the appointed person sworn in. Staff <br />recommended Council approve the resolution accepting the resignation of Council Member <br />Chuck Haas and declaring a vacancy to be filled by appointment. Staff further recommends <br />Council select a date and time between Monday, May 24 and Friday, May 28 to hold interviews.
The URL can be used to link to this page
Your browser does not support the video tag.