My WebLink
|
Help
|
About
|
Sign Out
Home
2021.05.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.05.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:32:18 PM
Creation date
7/19/2021 4:31:45 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/17/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16 of 26 <br />Updated: 4/15/2021 <br /> <br />6. After the cyclist completes the ride, they will go back to the same <br />area as before to claim their t-shirt, jersey and other materials. <br />7. Once redeemed, the volunteer will instruct the cyclist to cut off <br />their wristband. <br />ii. Layout <br />1. The Mandatory Check-in Tent must be positioned as the first <br />visible area between the parking lot and the any other area of the <br />venue. <br />a. Larger rides with multiple access points will require <br />multiple tents and lanes. <br />2. Tent should be convertible to the T-shirt and Jersey distribution <br />area when participants return from completing the ride. Since this <br />area will transition, it will also be the last area between the venue <br />and the parking lot when participants are returning to their <br />vehicles. <br />3. Set up should be similar to a walk-through security line at concert <br />or sporting venue. <br />a. Example: <br />i. 20x20 tent with 2 lanes created by tables. <br />1. Tables in a straight line down the middle of <br />the tent and tables on the exterior to create <br />the lanes. <br />2. Staff and volunteers positioned at the <br />exterior tables with participants entering <br />and flowing through the created lanes to <br />complete confirmation of their health <br />screening. <br />3. Larger rides will require multiple tents and <br />lanes. <br />b. See diagram below and refer to Venue Setup and Flow for <br />general setup requirements.
The URL can be used to link to this page
Your browser does not support the video tag.