My WebLink
|
Help
|
About
|
Sign Out
Home
2021.06.21 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.06.21 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:34:33 PM
Creation date
7/19/2021 4:33:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/21/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />121st Avenue and Acres of Bald Eagle <br />Utility & Street Improvements Project <br />City of Hugo, MN <br />WSB Project No. 018363-000 Page 5 <br />4 PROPOSED IMPROVEMENTS <br /> <br />4.1 Utilities – Sanitary Sewer and Watermain <br /> <br />4.1.1 Sanitary Sewer <br /> <br />Sanitary sewer will be extended from the Metropolitan Council interceptor sewer into the <br />proposed development roadway and in 121st Street. The proposed sanitary sewer will be 8- <br />inches in diameter and extend 4-inch diameter services to seven new development lots fronting <br />Broadway Court. Two of the remaining new development lots will have one 4-inch diameter <br />sewer service extended from the existing sanitary sewer in Everton Avenue and one 4-inch <br />diameter sewer service extended from new sanitary sewer in 121st Street. Proposed sanitary <br />sewer will be extended in 121st Street from about 230-feet to 1,100-feet east of Everton Avenue, <br />with 4-inch diameter sewer services extending to eleven existing parcels fronting 121st Street. <br />Two additional existing lots with frontage on Falcon Avenue will have sanitary sewer services <br />extended from the proposed development roadway through a utility easement to the back-lot line. <br /> <br />See Figure No. 4 in Appendix A for the proposed sanitary sewer and sewer service layout. <br /> <br />4.1.2 Watermain <br /> <br />In conformance with the 2040 Comprehensive Plan, 12” diameter watermain will be extended in <br />121st Street from the existing stub at Everton Avenue to Falcon Avenue, and 8-inch diameter <br />watermain will extend in the new roadway in the proposed development from 121st Street. A 6- <br />inch watermain will be extended east from Broadway Court to provide water service and to two <br />properties with frontage on Falcon Avenue. The watermains will include hydrants, gate valves <br />and fittings and services. <br /> <br />The new lots created by the development will have 1-inch diameter water services extended to <br />the property line. Two of the new lots will have 1.5-inch services, one extended from Everton <br />Avenue to the property line and one from 121st Street extended to the property line. The larger <br />diameter services are provided since the house pads will be 200-300 feet from the watermain for <br />these properties. Existing lots with frontage on 121st Street will have 1-inch diameter water <br />services extended from the new watermain to the property line. Existing lots with frontage on <br />Falcon Avenue will have 1-inch diameter services extended from the 6-inch diameter watermain <br />in a utility easement from the new roadway in the proposed development. <br /> <br />See Figure No. 4 in Appendix A for the proposed watermain and water service layout. <br /> <br />4.1.3 Storm Sewer <br /> <br />The Acres of Bald Eagle development will have storm sewer conveyance system to collect storm <br />water runoff from the proposed development, and discharge to on-site storm water basins. The <br />prosed storm sewer consists of two storm drains located south of the cul-de-sac in the curb flow <br />line to collect storm runoff and 15-inch diameter reinforced concrete pipe to convey storm water <br />to an on-site drainage basin, discharging east of the new roadway. One drainage basin extends <br />along the east and north perimeter of the plat, with a second small basin northwest of 121st Street <br />and Broadway Court. The drainage basins are proposed as infiltration basins with overflow weirs <br />on each. Two spillways are proposed to convey storm water runoff or about half the length of the <br />roadway through swales to the storm water basins. Staff is currently reviewing the application <br />and will provide the development team comments on the stormwater management plan. <br /> <br />Drainage along 121st Street will continue in the existing ditches and overland as in the existing <br />drainage condition. Stormwater management requirements for 121st Street will be <br />accommodated for within the Acres of Bald Eagle development.
The URL can be used to link to this page
Your browser does not support the video tag.