My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 09.16.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 09.16.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:57:23 PM
Creation date
1/3/2022 3:54:27 PM
Metadata
Fields
Template:
Commissions
Meeting Date
9/16/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. <br />0 <br />U <br />0. <br />Z <br />w <br />m <br />U) <br />a <br />00 <br />Lo <br />co <br />U) <br />J <br />0 <br />a <br />a <br />w <br />Z <br />Z <br />2 <br />0 <br />w <br />Z) <br />U) <br />T <br />ws b <br />Memorandum <br />To: City of Hugo <br />From: Candace Amberg, WSB <br />Date: September 16, 2020 <br />Re: Goodview Ave Trail Feasibility Plan <br />WSB Project No. 016114-000 <br />Trail Feasibility Overview <br />The City of Hugo authorized WSB to proceed with a trail feasibility plan for a pedestrian route <br />along Goodview Ave N from 145t" St N to Egg Lake Road, as identified in the City of Hugo <br />Comprehensive Trails Plan. <br />Goodview Ave N is a State Aid roadway with a rural section road design that is 24 feet in width to <br />include 11-foot drive lanes and 1-foot paved shoulder in both directions and is signed at 40 mph. <br />There are overhead power lines on the east side of the road, portions of the Hardwood Creek on <br />about half of the east side corridor and there are wetlands on both sides. Egg Lake Road has <br />wide shoulders and a concrete on the south side that connects Goodview Ave N to Hwy 61 and <br />the Hardwood Creek Regional Trail. <br />The following outlines the project process and outcomes to -date: <br />Preliminary Options: <br />WSB looked at several options for a pedestrian route along Goodview Ave N which was broken <br />up into two segments; 145t" St N to Geneva Ave N and Geneva Ave N to Egg Lake Road. <br />The options included: <br />145t" St N to Geneva Ave N: <br />1. Elimination of widened shoulders or a separated trail as an option from 145th St N to <br />Geneva Ave N due to the high costs of implementation. A shared on -road route along <br />Goodview Ave N for this segment with Share the Road signage was provided as an <br />option for consideration <br />2. Sidewalk connection along 145t" St N from the intersection of Goodview Ave N to <br />Glenbrook Ave N to connect to existing walkways with on -street routes identified along <br />Glenbrook Ave N to Geneva Ave N south to where it meets with Goodview Ave N. <br />Geneva Ave N to Egg Lake Road: <br />1. 5-foot paved shoulders with 2-foot gravel shoulders along both sides of the roadway. <br />2. 8-foot separated bituminous trail with 5-foot buffer on the west side of the roadway only. <br />3. An optional 10' wide boardwalk to replace the bituminous trail in specific segments to <br />avoid wetland impacts. <br />K:\016114-000\Admin\Docs\016114_2020-0916_Goodview Ave Feasibility Summary.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.