Laserfiche WebLink
DNR Shoreland Overlay: <br />After meeting and working with the DNR, we have designed the Shoreland Overlay District area (300' <br />from County Ditch #3) to meet the DNR requirements for the Residential PUD requirements. We are <br />proposing 25 single family Villa lots and maintaining 50% open space, see DNR residential PUD Analysis <br />spreadsheet below. <br />18301- Hugo SF Residential <br />Residential PUD Analysis - River with GD Shoreland Classification, Sewered Lots <br />Density and allowable unit calculation: <br />Fill In This Fill In This Fill In This Calculated Calculated Fill In This <br />Field Field Field Field Field Field <br />Allowable <br />Minimum Lot <br />Bonus <br />Units per Tier <br />Total <br />Unsuitable <br />Suitable <br />Size for GD River <br />Base <br />Density <br />with Bonus <br />Proposed <br />Tier <br />Area <br />Area <br />Area <br />(Sewered) <br />Density <br />Factor <br />Density <br />Units <br />75' wide (min) <br />1 <br />415,327 <br />0 <br />415,327 <br />(1377If.} <br />15.4 <br />1.5 <br />27.5 <br />26.0 <br />Total <br />1 415,327 <br />1 ❑ <br />1 415,327 <br />0% <br />1 1❑❑% <br />* * * Note: Per 6.26 of code min. lot width of 5F lot(5) i5 75'. There are no minimum lot sf requirements <br />for rivers and streams <br />These lots will meet all DNR PUD Shoreland Overlay District standards for single family Villa lots. <br />Our proposed PUD maintains, restores and creates a significant amount of wetland area, natural <br />environmental features, and public open space. We designed an internal trail system that will connect <br />to the future trails in the City park property to the west. <br />Our PUD will connect to Farham Ave. N. to the southwest with a public road through the City park <br />property. Per our discussions during Sketch Plan approval, we will pay for the site grading and road <br />improvements on the City park land, and for the City to pay for the utility improvements on the park <br />property. The Preliminary Plat also shows two future street connections to the north, that will <br />ultimately connect to 165t" St. N. We are not showing a street connection to the east as this property is <br />zoned Business Park (BP) and guided as Industrial (IND). <br />Comprehensive Plan Amendment: <br />As shown on our Preliminary Utility Plan, we are proposing to connect to the Metropolitan Council's <br />interceptor sewer at our northwest property corner. We would then extend the City's 36" trunk <br />sanitary sewer line to our northeast property corner. This would require an update to the City's 2040 <br />Comprehensive Plan. <br />This project proposes to amend the comprehensive plan to gain access to trunk utilities (Sanitary Sewer <br />and Water) for this project as well as the future extension of trunk utilities to this area of the City. The <br />current comprehensive plan shows connections to trunk sanitary sewer at 165t" Street (one parcel north <br />of our proposed connection point. Through conversations with City staff, it was determined that our <br />