My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 02.17.21
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2021
>
Parks Packet 02.17.21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 8:49:08 AM
Creation date
1/5/2022 8:43:28 AM
Metadata
Fields
Template:
Commissions
Meeting Date
2/17/2021
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposed trunk sanitary sewer connection point would serve as well as the original proposed location on <br />1651h street for the surrounding properties and would enable this property to develop. Trunk water is <br />also served at our southwestern property corner near the water tower and will extend trunk water to <br />our north property line. This is a better location for trunk water connection in order to develop with the <br />comprehensive plan. Otherwise, the water would need to "leap frog" two parcels to reach 165th. The <br />trunk sanitary sewer and watermain will be constructed as part of this development and extended to <br />the project boundaries. This proposed trunk utility connection plan and modification to the <br />comprehensive plan is logical, prudent and efficient to begin the extension of City trunk utilities to this <br />area of the City. <br />PUD 6enefitsc <br />Our development plan will provide several benefits over the standard medium density (townhome) <br />zoning: <br />1. An efficient use of land for single family residential construction that enables greater community <br />engagement and interaction. <br />2. Design is an environmentally sensitive proposal with less density than would be allowed under <br />medium density guidelines and attached townhomes. <br />3. Providing landscaping that exceeds the City minimum requirements. <br />4. Incorporating architectural design guidelines for homes in the development. <br />5. Villa product types that are appealing to different home buyers and enhancing visual interest of <br />the proposed neighborhoods. <br />6. Open space that promotes outdoor engagement and visual connectivity between residential <br />units and their surroundings. <br />7. Construction of a Public Street to provide access to the City park land at developer's expense. <br />8. Construction of a trunk sanitary sewer connection to begin the expansion of development <br />potential in the area of the city with cost sharing with the City. <br />9. The extension of the City's trail system thru the subdivision at developer's expense. <br />These design details all demonstrate our commitment to providing a high -quality development worthy <br />of receiving the PUD designation. The creation of non-standard setbacks and lot sizes for the villa lots <br />requires the PUD zoning designation, which is the primary reason for our PUD request. The proposed <br />PUD subdivision creates a variety of lot types allowing for a diverse type of housing. Thus, the proposed <br />subdivision facilitates the mixed -use development goals sought after in the PUD Planned Unit <br />Development zoning standards. In addition, the proposed PUD will preserve to the maximum extent <br />possible the site's natural environmental features, and provide for trail connections to the City park. <br />In addition to the PUD benefits described above we also considered stormwater reuse for irrigation for <br />the site. Stormwater Reuse for the purposes of irrigation is somewhat common in the City of Hugo and <br />for good reason. Conservation and sustainability. We have considered the possibility of stormwater re- <br />use for this project and have decided it is not feasible for this site for the following reasons. <br />1. The site has an extensive wetland system that needs all the stormwater runoff to be sustained. <br />The existing wetlands on the site constitute approximately 18% of the site area. Due to the <br />creation of new wetlands as part of the project development, at completion of the project the <br />area of wetlands will be approximately 21% of the site area. We are increasing wetland area <br />which drives a demand for stormwater. Stormwater sustains the wetlands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.