Laserfiche WebLink
Feasibility Report <br />2022 Oneka Parkway Improvement Project <br />City of Hugo, MN <br />WSB Project No. 018888-000 Page 2 <br />2. INTRODUCTION <br />2.1 Authorization <br />On September 7, 2021, the Hugo City Council authorized the preparation of a feasibility report for the <br />2022 Oneka Parkway Improvement Project. <br />2.2 Scope <br />This feasibility report includes street improvements and limited drainage improvements along Oneka <br />Parkway from Frenchman Road (CSAH 8) to Heritage Parkway. The project also includes the <br />construction of a right-turn lane to north bound Oneka Parkway at Frenchman Road. <br />Washington County has also identified the need for a traffic signal at the intersection of Oneka Parkway <br />and County Road 8 and is proposing to move that work from 2024 to 2022 to be included in the Oneka <br />Parkway project. <br />2.3 Data Available <br />Information and materials used in the preparation of this report include the following: <br />City of Hugo 5-Year Capital Improvement Plan, approved in 2020 <br />City of Hugo Assessment Policy Manual <br />City of Hugo Property Index Records <br />City of Hugo Record Drawings <br />Pavement Cores/ Soil Borings <br />Topographic Survey <br />Field Observations of the Project Area <br />2.4 Project History <br />The 2022 Oneka Parkway Improvement Project is identified in the City’s Capital Improvement Plan to <br />address the deteriorating condition of the roadway.