My WebLink
|
Help
|
About
|
Sign Out
Home
2024.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 11:55:36 AM
Creation date
2/28/2024 11:53:41 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\Watercrest of Hugo\Watercrest of Hugo 1st and 2nd Addition Final Plat\Engineers Red-lined Comments\Eng <br />Memo_Watercrest of Hugo Final Plat 02.05.24.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM February 5, 2023 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Water Crest of Hugo and Water Crest of Hugo 2nd Addition <br /> WSB Project No. 020259-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Final Plat submittal for the Goodview Estates development. We have <br />reviewed the following information related to this application: <br /> <br />• Final Plat for Water Crest of Hugo and Water Crest of Hugo 2nd Addition <br />• The Construction Plans with revision a date of November 28, 2023 by Saether-Bergquist, <br />Inc. <br />• Stormwater Report dated December 6, 2023 by AE2S <br /> <br />We have not yet received the updated construction plans addressing our previous comments. <br />Once received, staff will verify comments have been addressed and easement dimensions on the <br />final plats are appropriate. Based on the review of the documents previously submitted, we offer <br />the following Engineering comments related to this application: <br /> <br />General/Access <br /> <br />1. The subject property is located west of Goodview Avenue south of 135th Street. <br />2. Access will occur from Goodview Avenue and two existing stub streets located off of 135th <br />Street in Birch Tree Ponds development. <br />3. The applicant has provided ROW along Goodview Avenue and trail easement to <br />accommodate a future trail along the west side of Goodview Avenue, consistent with the <br />Comprehensive Plan. <br />4. The applicant will be responsible to place in escrow, money to cover future costs of trail and <br />conversion of one-half of Goodview Avenue to an urban section, along the length of their <br />property adjacent to Goodview Avenue. This will be documented in the development <br />agreement and totals $136,365. <br />5. A sidewalk will be added to the south side of the east/west roadway in the 2nd Addition to <br />provide access to the trail network in the development and future trail along Goodview <br />Avenue. <br />6. The 8-ft trail will be required to connect to Arcand Park. Prior to the issuance of the <br />certificate of occupancy, trails must be constructed. <br />7. Exhibit C of the Development outlines development fees that will be completed for both Water <br />Crest of Hugo and Water Crest of Hugo 2nd Addition once we receive and review detailed bid <br />results from the developer. <br />8. Detailed redline comments have been documented on the plans and previously sent to the <br />applicants engineer so they can be addressed in future submittals. W e are currently waiting <br />for the resubmittal of the plans addressing our comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.