My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 071422
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 071422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:41:42 AM
Creation date
3/21/2024 10:39:41 AM
Metadata
Fields
Template:
Commissions
Meeting Date
7/14/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Goodview Estates Preliminary Plat <br />Page 4 <br /> <br />Sanitary sewer is proposed to be extended south from the Birch Tree Ponds development from <br />existing stubs extending south from 135th Street. Both current stubs are 10” pipe but will be <br />reduced to 8’ throughout the development and are not proposed to be extended beyond the <br />current development limits. Adjacent areas are served from different sewer service districts. <br /> <br />Streets/Access <br /> <br />Access will occur from Goodview Avenue and two existing stub streets located off of 135th <br />Street in Birch Tree Ponds. <br /> <br />The applicant has provided right-of-way along Goodview Avenue and trail easement to <br />accommodate a future trail along the west side of Goodview Avenue, consistent with the <br />Comprehensive Plan. <br /> <br />The applicant will be responsible to place in escrow, money to cover future costs of trail and <br />conversion of Goodview Avenue to an urban section, along the length of their property adjacent <br />to Goodview Avenue. This will be documented in the development agreement with the final <br />plat. <br /> <br />Parking <br /> <br />The City requires each home to provide a minimum of 2 parking spaces. We have included this <br />as a condition of approval. <br /> <br />Building Height <br /> <br />The maximum building height is 35 feet. The elevations should be provided and dimensioned in <br />order to insure this requirement is being met. This item will be reviewed with the building <br />permits. <br /> <br />Sidewalks/Trails <br /> <br />The City Code does not require sidewalks along roads for projects that has lots 80 feet in width <br />or larger. The applicant is not proposing sidewalks. <br /> <br />The applicant is proposing a meandering off-street trail with access from two points in the <br />development. The trails will be constructed of asphalt as it leaves the development and then <br />convert to gravel. The trail is proposed to extend through a City owned outlot in Adelaide <br />Landing for access to the park. The City will continue to work on the exact location of the trail. <br /> <br />Park Dedication <br /> <br />The applicant is proposed to pay the park dedicate fee for the development. The park dedication <br />fee is $3,400 per lot for a total of $197,200.00. The fee will be paid as part of the development <br />agreement with the final plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.