Laserfiche WebLink
Ms. Rachel Juba <br /> November 3, 2022 <br /> Page 2 <br /> 7. Per RCWD Rule C.6.d.2 if infiltration is feasible onsite, onsite volume control through either <br /> infiltration or water reuse must be used to provide the required water quality volume. If it not <br /> feasible for infiltration to provide all of the required water quality volume and alternative BMPs <br /> are proposed to provide water quality volume, it must be documented why that is the case. It <br /> should be noted that the site appears to be located within a high vulnerability DWSMA which <br /> requires a higher level of engineering review for infiltration to confirm infiltration will not cause <br /> negative impacts on groundwater. <br /> 8. Rate control and freeboard requirements are shown to be met with the current design but <br /> should be confirmed once comments on water quality have been addressed. <br /> 9. Drainage and utility easement should be shown over the proposed stormwater management <br /> basins and access pathways to the basins. <br /> 10. A maintenance agreement will be required for the stormwater management facilities. <br /> 11. Water reuse on this site is not intended, nor practical given the site characteristics. <br /> 12. Stormwater plan and model comments have been provided to applicant and will need to be <br /> addressed in future submittals for documentation and permitting purposes. <br /> Wetland <br /> 13. 0.39 acres of wetland impacts are proposed with the project. A replacement plan application <br /> was submitted on September 27, 2022. Comments were received by the TEP and the <br /> applicant is currently working to address those comments. <br /> Thank you for the opportunity to provide comments on this project. Additional comments may be <br /> necessary following the review of the responses to these. If you have any questions, please do <br /> not hesitate to contact me at 651-286-8463. <br /> Sincerely, <br /> WSB <br /> Mark Erichson, PE <br /> City Engineer <br /> cc: Scott Anderson, Public Works Director(email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br />